Skip to main content

Vancouver narrows bridge & tunnel options

The Burrard Inlet Rapid Transit Study has now identified five potential crossings
By David Arminas September 21, 2020 Read time: 2 mins
Transport crossings in Vancouver: more needed (© Vismax | Dreamstime.com)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration (see map below) are:

  • Downtown Vancouver to Lonsdale via First Narrows (tunnel)
  • Downtown Vancouver to Lonsdale via Brockton Point (tunnel)
  • Downtown Vancouver to West Vancouver via Lonsdale (tunnel)
  • Downtown Vancouver to Lonsdale via Second Narrows (new bridge)
  • Burnaby to Lonsdale via Second Narrows (new bridge)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

Vancouver transit plan
Map courtesy of British Columbia Ministry of Transportation and Infrastructure

 

Related Content

  • Another payment option for TransLink users
    January 13, 2023
    Riders can now use Canada's Interac and no longer need a pre-paid Compass card
  • Vancouver’s SkyTrain Evergreen extension now in service
    December 9, 2016
    Metro Vancouver's regional transportation authority, TransLink, has inaugurated the SkyTrain Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express. The SkyTrain line was first inaugurated in December 1985, utilising Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain
  • Keys to the Kingdom
    May 1, 2025
    Saudi Arabia is investing heavily in smart infrastructure projects. Zeina Nazer takes a look at them – from Riyadh Metro to the controversial ‘vertical urbanism’ of The Line
  • Adaptive traffic control drives financial benefits
    July 24, 2012
    Prof. Klaus Banse, President of ITS Colombia and Ing. Robert Miranda, Head of the Traffic Management and Control System of Cartagena de Indias, Columbia, outline early cost benefits of an adaptive traffic control system. At the beginning of this year, Cartagena de Indias, located on the north coast of Colombia in the Caribbean, implemented a new adaptive traffic control system on 52 intersections with an investment of US$4.5 million.