Skip to main content

Vancouver’s SkyTrain Evergreen extension now in service

Metro Vancouver's regional transportation authority, TransLink, has inaugurated the SkyTrain Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express. The SkyTrain line was first inaugurated in December 1985, utilising Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain
December 9, 2016 Read time: 1 min
Metro Vancouver's regional transportation authority, 376 TransLink, has inaugurated the SkyTrain  Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express.

The SkyTrain line was first inaugurated in December 1985, utilising 596 Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain network, including the Canada line.

With the completion of the 11 km long extension, which expands the SkyTrain network to 79.6 km, Metro Vancouver claims to have the longest, fully-automated, driverless rapid-transit system in the world, including a two kilometre tunnel.

Related Content

  • September 29, 2020
    SkyTrain signals more work for Thales
    Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
  • January 3, 2017
    Bombardier to build additional cars for Vancouver’s SkyTrain
    TransLink, Metro Vancouver’s regional transportation authority, has ordered an additional 28 Bombardier INNOVIA Metro 300 vehicles for service on the city’s SkyTrain network. The order is valued at US$69 million and production is scheduled to start in the third quarter of 2017 and final delivery is expected in the fourth quarter of 2018. The new vehicles will support TransLink’s efforts to open new lines and provide additional capacity, by carrying up to 3,640 more people on the SkyTrain network at a tim
  • January 26, 2012
    Vancouver's metro transport promotes alternatives to driving
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.