Skip to main content

Siemens, Thales land Spanish train deal

Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal
November 25, 2014 Read time: 2 mins
Spanish administrator of railway infrastructures, Adif, has awarded the 596 Thales/189 Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million.

Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signals, axle counters for safe train detection, wheel sensors and landline telecommunications systems. Thales will also install new state-of-the-art electronic interlockings at several stations on the Medina del Campo-Zamora-Ourense conventional line affected by the work on the high-speed line.

The company will also provide all GSM-R mobile communications systems, power supply for the facilities, auxiliary detection systems, equipment buildings and auxiliary building work.

Siemens will install its safety solution based on electronic interlockings and associated technologies, with the ASFA system, centralised traffic control, supply of balises, track circuits, video surveillance systems and access control.

ERTMS level 2 will allow a maximum speed of 350 km/h on this 331 kilometre stretch of the railway, reducing the journey to two hours. In 2018, it will provide a high-speed railway link between Ourense in Galicia and Olmedo near Valladolid.

For more information on companies in this article

Related Content

  • Active traffic management increases safety and capacity
    February 2, 2012
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • Weathering the elements: how weather affects the network
    July 29, 2013
    Weather-related problems can render cost-cutting counter productive, according to CommScope’s Philip Sorrells. When severe weather conditions make headlines every winter, motorists and travellers seem willing to accept the impact on the trains and roads and yet take for granted that the communications networks will continue uninterrupted. They often appear far more upset that the information system does not give them an update on road conditions, train services or bus arrival times than they are about the a
  • Indra brings in Citilog for Silvertown Tunnel incident detection
    June 27, 2024
    System will help reduce congestion in and around tunnel under River Thames in London
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    August 26, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.