Skip to main content

Siemens, Thales land Spanish train deal

Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal
November 25, 2014 Read time: 2 mins
Spanish administrator of railway infrastructures, Adif, has awarded the 596 Thales/189 Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million.

Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signals, axle counters for safe train detection, wheel sensors and landline telecommunications systems. Thales will also install new state-of-the-art electronic interlockings at several stations on the Medina del Campo-Zamora-Ourense conventional line affected by the work on the high-speed line.

The company will also provide all GSM-R mobile communications systems, power supply for the facilities, auxiliary detection systems, equipment buildings and auxiliary building work.

Siemens will install its safety solution based on electronic interlockings and associated technologies, with the ASFA system, centralised traffic control, supply of balises, track circuits, video surveillance systems and access control.

ERTMS level 2 will allow a maximum speed of 350 km/h on this 331 kilometre stretch of the railway, reducing the journey to two hours. In 2018, it will provide a high-speed railway link between Ourense in Galicia and Olmedo near Valladolid.

For more information on companies in this article

Related Content

  • Siemens to modernise metro line in Peru
    January 4, 2017
    Siemens is to provide the complete traction power supply for the first section of metro line 1 in Lima, which covers around nine kilometres. The modern power supply, upgrading of existing overhead contact line system and modifications to electrification in the depots will increase both the availability and the cost-effectiveness of the rail route. The upgrade will be carried out during ongoing operation. Lima's first metro line was completed in 2011, covering around 21 kilometres. The line connects the s
  • Serco extends Dubai Metro contract
    October 29, 2013
    International service company Serco Group is to continue to operate and maintain the Dubai Metro. The company has signed a five-year extension to its contract with the Dubai Government Roads and Transport Authority (RTA) in a deal valued at approximately US$571, with an opportunity to extend for a further two years to 2021. Serco first provided pre-launch consultancy and planning to the RTA from 2007 and began operating and maintaining the initial 10 stations on the Red Line from its official opening an
  • IRD: from the ground up
    September 16, 2021
    IRD is undertaking a comprehensive review of its road safety and monitoring solutions. A series of initiatives is building on the company’s in-pavement expertise, bringing considerable additional value for the customer to the traditional range of products while complementing these with wholly new technologies
  • Mexico City opts for Indra public transport management
    June 26, 2013
    Mexico City is to benefit from the latest public transport management technology, thanks to a contract recently awarded to Spanish consultancy and technology company Indra. The contract, valued at US$20.8 million, covers the supply, installation and commissioning of Indra’s comprehensive Operations Assistance System (OAS) for the city’s Metrobús system, together with technical support and maintenance for a period of ten years. The 95 km system has 151 stations and carries over 800,000 passengers per day.