Skip to main content

Hindhead Tunnel safety demonstration

A full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity.
April 20, 2012 Read time: 2 mins
RSSA full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity. However the link has also been designed with the latest safety technology and to meet the tough new European regulations on tunnel safety, introduced in the wake of two disastrous tunnel fires that caused multiple fatalities in Switzerland and Austria. At the 1.9km Hindhead Tunnel emergency crews from ambulance, fire and police services tested response times for a major incident. The staged scenario involved 16 mock casualties from two separate vehicle crashes and a serious fire underground. The emergency exercise involved 280 people and following the staged incident, car drivers, played by actors, began to walk outside to safety. Statistics suggest that a major incident can be expected in the A3 tunnel on average once every seven years, and a minor incident will lead to a tunnel closure every three years. The tunnel is due to open to traffic shortly. The link will carry some 30,000 vehicles/day and keep traffic away from the Devil's Punchbowl, a heathland site which is a special protection area for wild birds conservation.

Related Content

  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • California’s new tunnel has safety features inspired by deadly fire
    November 1, 2013
    A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.
  • Indra to manage traffic at seven tunnels in Colombia
    November 13, 2019
    Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
  • Temporary traffic monitoring with Bluetooth and wi-fi
    May 31, 2013
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech