Skip to main content

California’s new tunnel has safety features inspired by deadly fire

A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.
November 1, 2013 Read time: 2 mins
A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.

There were no traffic lights, emergency gates, or message signs to warn motorists of the fire inside, caused when a gasoline tanker burst into flames. The lessons learned from that have inspired the many safety features built into the new US$417 million fourth bore.

Some improvements have already been added to the First three tunnels, including surveillance cameras, variable message signs and external warning signs, and unlike the original two bores, the third and fourth bores will be connected by seven escape passages.

Traffic lights and a traffic gate that swings shut in emergencies have also been added to the third and fourth bores.

Fire and safety systems installed in the new bore include state-of-the-art fire detection and suppression systems. TOS and SCADA (Supervisory Control And Data Acquisition) systems will provide specially-trained operators with real-time information and management capabilities for the four tunnels’ traffic, fire detection, power supply, ventilation and lighting systems. These systems allow trained professionals at the new operations and maintenance control centre to monitor and respond to threats inside the tunnel, including detecting and suppressing fires and other hazards, and providing real-time information to help motorists safely exit in an emergency.

The project, which will bring congestion relief in the off-peak direction to commuters between Alameda and Contra Costa counties, is a partnership between (Caltrans), the Contra Costa Transportation Authority, the Alameda County Transportation Commission and the 343 Metropolitan Transportation Commission.

Related Content

  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • January 23, 2012
    Tunnel simulators vital for real world tunnel management
    Guillaume Ponsar, tunnel safety engineer with Egis Road Operation, writes about the advantages to be gained from the use of tunnel simulators. Major tunnel disasters over the last decade and more have shown how swiftly and badly a simple crash or fire may evolve should the wrong actions be taken by control room operators or traffic managers. Global safety issues and the reactions of operations staff have now become the principal concerns for Operations and Maintenance (O&M) service providers. As a result, n
  • September 14, 2016
    Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • August 26, 2016
    Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.