Skip to main content

Indra to manage traffic at seven tunnels in Colombia

Indra is to deploy its Horus traffic management platform to control seven tunnels and open-air roads in Colombia.
November 13, 2019 Read time: 2 mins

The €20 million contract on the final section of the Bogotá-Villavicencio Corridor includes the Buenavista tunnel - which at 4,559m long is one of the longest in Latin America.

The company claims Horus allows users to manage several ITS and safety systems and offers real-time information on everything happening in a tunnel.

The solution’s automatic detection system is expected to integrate information from cameras and sensors to send alerts to the control centre in the event of an incident or emergency. Air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollution outside, the company adds.

According to Indra, the solution’s radio system enables geofencing of the location of ambulances, firefighters, police and operation and maintenance vehicles inside and outside the tunnels.

The project will complete the Bogotá-Villavicencio two-lane road highway, in which Horus is already being used to manage 22 tunnels. The addition of seven more tunnels will connect the two cities in a bid to reduce travel time by 45 minutes.

As part of the deal, Indra will renovate the control centre in the municipality of Buenavista to help the nearby centres in Boquerón and Naranja monitor and control traffic.

The project includes the installation of communication systems such as Mova Comms, Mova Protect, ITS, CCTV, traffic counters, road signs, emergency call boxes, fire detection, lighting control and PA systems.

Indra was awarded the contract in a consortium with infrastructure and engineering firm Comsa Industrial through the Andean Road Consortium - which is responsible for the construction of a road between the towns of Chirajara and Fundadores, known as the Los Llanos highway.

UTC

Related Content

  • October 31, 2022
    ITS from Indra helps Colombia tunnels
    Tolling and communications are also major part of new Latin American infrastructure project
  • September 3, 2019
    Indra supervises 9km tunnel in Columbia
    Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • May 8, 2014
    Colombia awards major traffic management contract to Indra
    Colombian highway concessionaire Coviandes has awarded Indra the contract, worth nearly US$35 million, for the design, installation and start-up of the intelligent traffic systems (ITS) the control and communications systems for 45 kilometres of the Bogota-Villavicencio highway in Colombia.