Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Skanska to build underground tramway in Los Angeles
    July 4, 2014
    Skanska has, in a joint venture with Traylor Brothers, signed a contract with the Los Angeles County Metropolitan Transportation Authority to construct the Regional Connector, an underground tramway in downtown Los Angeles, USA. The total contract value for the joint venture company Regional Connector Constructors is US$918 million. The Regional Connector project consists of the design and construction of a three kilometre double track light rail transit subway in downtown Los Angeles with three new stat
  • Los Angeles Express Lanes links multiple modes of transportation
    January 25, 2012
    The Big Apple's loss is the City of Angels's gain, according to Ken Philmus
  • Orange County to manage traffic with trial interoperable CCTV
    September 12, 2014
    Interoperable CCTV can provide early warning of problems and help improve traffic management and incident response as Morteza Fahrtash and Carlos Ortiz explain. California’s transportation system is one of the state’s defining features and Caltrans (California Department of Transportation) strives to improving mobility across the state through the design, construction, operation and maintenance of the network of highway, freeways, toll roads and expressways.
  • Kapsch preliminary preferred vendor for Ohio bridge toll project
    September 16, 2014
    The Kentucky-Indiana Joint Board has unanimously selected Kapsch TrafficCom as the preliminary preferred proposer in the competition to provide an electronic toll system for the bi-state Ohio River Bridges project. The board’s action followed independent staff reviews of technical and financial proposals submitted by the competing firms. Kapsch was one of six interested companies that the board in January deemed qualified to submit proposals for the toll system provider (TSP) contract. The Indiana Fin