Skip to main content

Kapsch preliminary preferred vendor for Ohio bridge toll project

The Kentucky-Indiana Joint Board has unanimously selected Kapsch TrafficCom as the preliminary preferred proposer in the competition to provide an electronic toll system for the bi-state Ohio River Bridges project. The board’s action followed independent staff reviews of technical and financial proposals submitted by the competing firms. Kapsch was one of six interested companies that the board in January deemed qualified to submit proposals for the toll system provider (TSP) contract. The Indiana Fin
September 16, 2014 Read time: 2 mins
The Kentucky-Indiana Joint Board has unanimously selected 4984 Kapsch TrafficCom as the preliminary preferred proposer in the competition to provide an electronic toll system for the bi-state Ohio River Bridges project.

The board’s action followed independent staff reviews of technical and financial proposals submitted by the competing firms. Kapsch was one of six interested companies that the board in January deemed qualified to submit proposals for the toll system provider (TSP) contract.

The Indiana Finance Authority (IFA), which is ultimately responsible for implementing the TSP procurement, is meeting in Indianapolis tomorrow today and is expected to give its preliminary approval to the selection of Kapsch. On 29 September, the authority will hold a public hearing on the TSP procurement. IFA intends to meet in October to consider final approval of Kapsch’s proposal. A notice to proceed could be issued as soon as November.

The TSP contract will embrace the supply and installation of vehicle detection and classification equipment, a back office billing system, customer service facilities and violations processing. The vendor will be responsible for installation, operation and maintenance of the entire system. Toll gantries and equipment pads will be supplied by the design-build contractor. Kapsch has already received a separate contract to supply transponders and multi-protocol readers for the project.

Related Content

  • March 13, 2015
    Kapsch preferred bidder on Ohio River Bridges toll project
    The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
  • October 22, 2013
    Indiana to issue major toll procurement tender
    Indiana state agencies have begun procurement of toll systems covering some thirty lanes on three bridges over the Ohio River in the Louisville, Kentucky/southern Indiana metro area. Indiana Finance Authority (IFA) is procuring a toll system provider (TSP) to supply and install in-road loops or other vehicle detection, tracking and vehicle classification and cameras, together with a back office system, customer service centre and violations processing system and centre, along with operation and maintena
  • October 28, 2014
    Bi-State board votes to restart tolling services procurement
    The Kentucky-Indiana Joint Board for the Ohio River Bridges Project has voted to restart the procurement of a tolling services provider. The vote comes after the Indiana Finance Authority’s review of a protest submitted by a non-winning bidder in late September. The Joint Board heard from the IFA that the allegations made in the protest were unsubstantiated, but the agency did uncover a significant potential personal and organisational conflict of interest regarding financial arrangements between a subc
  • May 14, 2015
    Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges
    Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As