Skip to main content

FDOT to award Florida I-4 Ultimate project

The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
April 24, 2014 Read time: 2 mins
The 4503 Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today.

The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total design and construction cost of US$2.3 trillion.

The project includes the reconstruction of 21 miles of I-4; the I-4 Ultimate project adds four tolled express lanes to I-4 while maintaining the existing free general use lanes, providing a choice to motorists. The express lanes will be operated with variable tolls which will be adjusted to improve traffic flow throughout the corridor. FDOT will retain the toll revenue and will control the toll rates.

The I-4 Mobility Partners team includes 7136 Skanska Infrastructure Development, John Laing Investments, Construction Joint Venture (Skanska USA Civil Southeast, Granite Construction and the Lane Construction), Design Joint Venture (HDR Engineering and 6320 Jacobs Engineering Group) and Infrastructure Corporation of America.

The I-4 Mobility Partners team provided FDOT with additional technical enhancements in its proposal that included direct connections from I-4 express lanes to SR 408, capacity improvements in the form of additional auxiliary lanes and turn lanes, pedestrian bridges, and enhanced aesthetics along the facility. Construction is expected to begin in 2015 and be completed in 2021.

FDOT Secretary Prasad said, “The use of a public-private partnership for the I-4 Ultimate project will help us deliver these improvements 20 years sooner than using conventional methods. This benefits Central Florida residents, commuters and visitors.”

For more information on companies in this article

Related Content

  • Study: How to fund Interstate highways in a way truckers and drivers can support
    July 24, 2015
    As the US Congress once again struggles to find funding for a long-term highway bill, a new Reason Foundation study details why truckers should embrace the use of tolling to finance the reconstruction and modernisation of aging Interstate highways, describes how all-electronic tolling can solve the industry’s previous privacy and logistical concerns about toll roads and proposes a set of rules to ensure that the tolls paid by truckers and motorists are used only to rebuild and widen the newly tolled Inters
  • Move NY Legislation introduced
    March 29, 2016
    A coalition of New York State Assembly Members has unveiled legislation that they say will not only fund Metropolitan Transportation Authority (MTA) capital needs but will create a US$4.5 billion Transit Gap Investment Fund (TGIF) to expand public transit and improve accessibility for millions of New Yorkers, particularly those who live in so-called ‘transit deserts’. Introduced by Assembly Member Robert J. Rodriguez, chair of the subcommittee on infrastructure, and joined by 14 co-sponsors from across t
  • Texas toll road contract awarded
    March 2, 2015
    The Texas Transportation Commission has awarded a contract to the Blueridge Transportation Group for the the planning, construction, financing, operation and maintenance of an express toll road and additional infrastructures for the SH 288 toll lanes project in Harris County in Texas. The consortium includes Israel-based Shikun & Binui Holdings, together with an infrastructure contractor and a financial investor. The ten mile stretch of road will connect Harris County to Houston. The project includes constr
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str