Skip to main content

WSP/Parsons Brinckerhoff designing new bridge in Florida

WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
November 15, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff  will design a new bridge in Pensacola, Florida as part of a design-build team led by 7136 Skanska. The project is being undertaken on behalf of the 4503 Florida Department of Transportation.

The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, reconstruction of the bridge approaches, and improvements to public facilities in the Gulf Breeze Wayside Park.

The new bridge is intended to be an iconic structure that increases capacity, driver safety and offers an unmatched pedestrian experience, encouraging walkers and cyclists to explore and enjoy the journey from shore-to-shore. At night, the bridge will provide a ribbon of light across the bay.

The bridge will feature a wishbone tied arch main span. The arches are designed to maximise the visual impact from all perspectives and provide a durable, easily maintained structure. The architectural details of the tower- supported shade structures and piers mimic the arch’s wishbone, providing aesthetically pleasing views from both the low- and high-level portions of the bridge. Lighting, railings, surface finishes and other details are detailed to accentuate the architecture.

Construction on the project is expected to begin in the spring of 2017 with completion scheduled for the summer of 2020.

Related Content

  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • August 19, 2015
    Tolling industry volunteers help Oklahoma boys find ‘home’
    IBTTA volunteers restore and upgrade facilities at an Oklahoma boys home during its annual Maintenance & Roadway Operations Workshop. Oklahoma receives an average of 55 tornado strikes each year. Some are small; others are huge and violent. All inspire fear. “It sounded like a freight train was headed for my house.” That’s how people often describe the sound they hear just befo
  • October 15, 2014
    New York’s Hudson Bridge goes AET
    New York’s Metropolitan Transportation Authority Bridges & Tunnels (MTA B&T) has selected TransCore to deploy the agency’s first all-electronic tolling (AET) system on the historic Henry Hudson Bridge. Built in 1936, the iconic bridge provides passage for more than 63,000 vehicles each day. The AET project is part of a three-year, US$33 million MTA B&T bridge rehabilitation project to replace the original 1930s steel supports as well as install 3,600 feet of new bridge decking, new energy-efficient roadw
  • May 6, 2016
    D'Artagnan to prepare road usage charge demonstration implementation plan for WSTC
    D'Artagnan Consulting has been awarded a contract by the Washington State Transportation Commission (WSTC) to prepare a detailed state-wide road usage charge (RUC) demonstration implementation plan in preparation for a project expected to start in 2017. The company is working with Berk Consulting, WSP/Parsons Brinckerhoff and several DBE firms and the work will entail updating the WSTC body of materials assessing RUC since 2012 that was successfully completed at the direction of the State Legislature.