Skip to main content

WSP/Parsons Brinckerhoff designing new bridge in Florida

WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
November 15, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff  will design a new bridge in Pensacola, Florida as part of a design-build team led by 7136 Skanska. The project is being undertaken on behalf of the 4503 Florida Department of Transportation.

The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, reconstruction of the bridge approaches, and improvements to public facilities in the Gulf Breeze Wayside Park.

The new bridge is intended to be an iconic structure that increases capacity, driver safety and offers an unmatched pedestrian experience, encouraging walkers and cyclists to explore and enjoy the journey from shore-to-shore. At night, the bridge will provide a ribbon of light across the bay.

The bridge will feature a wishbone tied arch main span. The arches are designed to maximise the visual impact from all perspectives and provide a durable, easily maintained structure. The architectural details of the tower- supported shade structures and piers mimic the arch’s wishbone, providing aesthetically pleasing views from both the low- and high-level portions of the bridge. Lighting, railings, surface finishes and other details are detailed to accentuate the architecture.

Construction on the project is expected to begin in the spring of 2017 with completion scheduled for the summer of 2020.

Related Content

  • October 28, 2021
    Cost Benefit: Don’t waste your energy
    There are ways that we can harvest power from the world’s roads – without necessarily building new infrastructure. David Crawford investigates some of these new approaches
  • February 3, 2017
    SENSKIN project develops first prototype of infrastructure monitoring sensor
    SENSKIN, a 42-month European Horizon 2020 project to develop a sensor for monitoring-based maintenance of the transport infrastructure implemented by 13 partners from seven countries has reported on its first 18 months of work. During this time, the partners derived user requirements and, based on these, designed the prototype of the skin-like sensors and the data acquisition unit. They also provided proof of concept of the communication system and are finishing the prototypes of the communication, structur
  • September 12, 2017
    Philips Lighting and American Tower Corporation form alliance develop smart street lighting
    Wireless infrastructure provider American Tower Corporation has formed an alliance with Philips Lighting to co-develop a high performance smart street lighting pole for smart city applications in the US. The companies are developing a 4G/5G-enabled LED smart light pole for use in roads, streets and parking lots to improve wireless broadband access in dense urban areas while also providing quality energy-efficient connected LED lighting.
  • August 1, 2017
    Strabag consortium awarded HS2 high speed rail civil engineering contract
    The SCS consortium, comprising Strabag, Skanska and Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester. The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.