Skip to main content

Western US governors collaborate on EV corridor

The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
December 22, 2016 Read time: 2 mins
The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states.

The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway.

This regional electric charging station network aims to address range anxiety, the concern that recharging may not be available for long-distance travel or trips outside of major cities. The electrification of major regional corridors is expected to facilitate the vehicle market transformation and allow smaller communities to connect to the regional system.

All three states have electric vehicle market potential. Colorado offers a US$5,000 tax credit on electric vehicle purchases and has nearly 8,000 electric vehicles on the road in Colorado today, compared to less than 100 in 2011. It has also already begun building charging stations through the Charge Ahead Colorado program.

Utah currently ranks seventh in the US for electric vehicle adoption and recently unveiled its Mighty Five Corridor initiative, while Nevada is ranked 13th in the nation for electric vehicles, with 2,104 electric vehicles and 31,937 hybrid vehicles registered in the state. It has a goal to complete an electric highway system serving the entire state by 2020.

Related Content

  • ‘Quick charger’ for electric vehicles
    November 22, 2012
    UK company Chargepoint Services has partnered with France-based DBT to distribute their Rapid Charge Unit for electric vehicles. The DC chargers can recharge an electric vehicle, such as the Nissan Leaf, to approximately 80 per cent battery capacity in just 20-30 minutes, but costs around 60% less than other rapid chargers currently on the market today. The company says this could help revolutionise electric vehicle travel, making longer journeys “range-anxiety free” by bringing refuelling times closer to
  • Tolls to help fund improvements to the Brent Spence Bridge
    January 29, 2015
    The International Bridge, Tunnel and Turnpike Association (IBTTA) has applauded Governors Beshear (Kentucky) and Kasich (Ohio) following their announcement that they plan to use tolls to pay for at least part of the US$2.63 billion Brent Spence Bridge replacement. Brent Spence Bridge is a double deck, cantilevered truss bridge that carries Interstates 71 and 75 across the Ohio River between Covington, Kentucky and Cincinnati, Ohio. Originally designed to carry 80,000 vehicles per day, approximately 172,0
  • Connected vehicles - potential to transform US transportation
    April 12, 2013
    There’s a new face in the driving seat at the US Department of Transport’s ITS Joint Program Office. Fortunately, as Robin Meczes finds out, he’s no learner driver… Ask Kenneth Leonard why he wanted his new job as director of the ITS Joint Program Office, and his answer comes back without a second’s delay. “The potential to save lives, reduce injuries and help people enjoy a more efficient transportation system is the kind of challenge that makes me want to come to work each morning,” he says. “In my opinio
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst