Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

Related Content

  • May 5, 2017
    Balfour Beatty JV awarded Southern Gateway contract by Texas DOT
    Pegasus Link Constructors, a joint venture comprising infrastructure group Balfour Beatty and Fluor Corporation, has been awarded a US$625 million (£484 million) contract to reconstruct and improve the Southern Gateway, an 11 mile stretch of road in Dallas, Texas. The Texas Department of Transportation awarded the contract as part of the Clear Lanes initiative, a programme that prioritises funding for congestion relief projects in Texas’ metropolitan areas. The improvement scheme will improve road-user saf
  • February 5, 2018
    Fluor chosen for LA International Airport Automated People Mover
    Fluor Corporation (Fluor) has been chosen to lead the design-build joint venture team to operate and maintain the Los Angeles International Airport (LAX) Automated People Mover project for the Los Angeles World Airports (LAWA). It aims to provide passengers and employees with reliable and time-certain access to the airline terminals with the design and construction commencing later this year. The passenger service is scheduled for 2023.
  • May 10, 2018
    STV selected to design Massachusetts rail extension
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • March 25, 2019
    Fluor and partners to build and operate LAX Automated People Mover
    Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president