Skip to main content

Volvo's electric buses begin operation in Luxemburg

From the beginning of June, four of Volvo’s all-electric 7900 buses have been in operation in Differdange, Luxembourg, operated by Sales-Lentz, which also has 12 electric hybrids and 30 hybrids from Volvo in its fleet.
June 13, 2017 Read time: 1 min

From the beginning of June, four of 609 Volvo’s all-electric 7900 buses have been in operation in Differdange, Luxembourg, operated by Sales-Lentz, which also has 12 electric hybrids and 30 hybrids from Volvo in its fleet.

The new buses are part of Differdange's sustainability drive, with public transport forming a crucial focus area. The new buses are used on four routes and each bus is driven for approximately 25 minutes, then its batteries are fast-charged in three to six minutes at the end stations using an open interface known as OppCharge (opportunity charging). The charging stations were supplied by Heliox.

The 12m long Volvo 7900 all-electric bus can carry up to 85 passengers and is equipped with an electric motor and lithium-ion batteries. According to Volvo, the buses have 80 per cent lower energy consumption than a comparable diesel bus and are silent and emission-free.

OppCharge opportunity charging is compatible with other brands and models of electric buses.  The chargers offer charging power of 150, 300, 450 or 600 kW, while the buses’ on-board pantographs connect automatically to an overhead charging mast.

For more information on companies in this article

Related Content

  • London's new Silvertown Tunnel set to open
    January 13, 2025
    TfL says average peak journey times expected to be 20 minutes quicker
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • Reversible express lanes and open road tolling combat congestion
    March 2, 2012
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway