Skip to main content

London's new Silvertown Tunnel set to open

TfL says average peak journey times expected to be 20 minutes quicker
By Adam Hill January 13, 2025 Read time: 2 mins
Tunnel vision (© Hupeng | Dreamstime.com)

The new Silvertown Tunnel beneath the River Thames in the east of London, UK, is set to open on 7 April 2025.

The 1.4km-long twin-bore tunnel has two lanes per tunnel with dedicated lanes for heavy goods vehicles and buses. 

Indra has equipped the new structure with its In-Mova Traffic platform and intelligent transport systems including communication systems, radio communications network and traffic signals. 

Citilog has integrated its automatic incident detection system, which includes 59 CCTV cameras, to help reduce congestion in and around the tunnel. It provides real-time incident detection and response to enhance safety and incident management, and is designed to minimise false alarms while maintaining high detection accuracy.

Using thousands of video clips will help train an advanced network to reduce false positives, allowing operators to focus on genuine emergencies.

The new tunnel runs between the London borough of Greenwich, the peninsula area, and West Silvertown on the northern bank of the Thames.

Transport for London (TfL) says modelling shows it will help reduce congestion at the existing Blackwall Tunnel, with average journey times expected to be up to 20 minutes quicker at peak times.

It will also help manage overall air quality and allow for better cross-river public transport, TfL says, with new bus routes - free for the first year - meaning that bus crossings increase from six to 21 per hour.

While you will not be able to walk or cycle through the tunnel, a new zero-emission cycle-shuttle service is due to operate every 12 minutes, seven days a week.

Related Content

  • June 27, 2024
    Indra brings in Citilog for Silvertown Tunnel incident detection
    System will help reduce congestion in and around tunnel under River Thames in London
  • September 10, 2024
    Bridge & tunnel management: seeing the bigger picture
    A variety of technologies are available to monitor the health of critical infrastructure – and to keep the drivers who use it safe by flagging incidents while reducing false alarms
  • October 14, 2014
    New river crossings vital for east London
    With the capital’s population forecast to grow to 10 million people by 2030, and with much of this growth due to take place in east London, demand for crossing the river will increase. Unless new river crossings are provided in east London, the overall growth of this part of London will be affected and its economic potential will not be fully realised. The Silvertown tunnel is a key part of the plans and is now progressing to the next stage with a consultation that starts on 15 October on detailed propos
  • May 18, 2012
    AMG transmission system used in Blackwall Tunnel refurbishment
    AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.