Skip to main content

US DOT awards funding for Maryland Purple Line Project

The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
August 29, 2017 Read time: 2 mins

The 324 US Department of Transportation’s 2023 Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties.

The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College Park, and New Carrollton to three Washington Metropolitan Area Transit Authority rail lines, all three Maryland Area Regional Commuter (MARC) rail lines and 2008 Amtrak’s Northeast Corridor line. Although the project will provide direct connections with Metrorail and MARC, it will remain physically and operationally separate. When completed, the line will make suburb-to-suburb cross-county travel easier and faster.

The project includes the construction of 21 stations, two vehicle and maintenance storage yards with shop facilities, and the procurement of 25 articulated light-rail vehicles.

In addition to the funding from FTA’s Capital Investment Grants Program, in June 2016 US DOT announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$874.6 million to Purple Line Transit Partners for construction of the Maryland Purple Line.

Purple Line Transit Partners to design, build, finance, operate and maintain the 16.2-mile light rail system. MDOT will be the owner of the project and its selected private partner, Purple Line Transit Partners, will implement the project on a design-build-finance-operate-maintain basis.

For more information on companies in this article

Related Content

  • LA Airport Metro Connector breaks ground
    July 5, 2021
    Project includes electric bus charging stations and is scheduled for 2024 completion
  • Key Russian PPP project
    April 18, 2012
    The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
  • FTA calls for infrastructure investment in Chancellor’s Spending Review
    September 11, 2015
    The Freight Transport Association (FTA) has told the Chancellor that investment in roads and rail infrastructure is key to the UK’s future growth in its submission ahead of his 2015 Spending Review. Chancellor George Osborne will publish his review on 25 November, setting out how the Government will invest in priority public services and deliver the US$31 billion further savings required to eliminate Britain’s deficit by 2019-20. FTA says the UK economy’s reliance on freight means investing in the s
  • Record-breaking year for US toll facilities, says IBTTA
    April 1, 2016
    Last year (2015) was a record-breaking year for toll road, bridge and tunnel usage according to a new report from the International Bridge, Tunnel and Turnpike Association (IBTTA). The National Toll Facilities Usage Analysis found that drivers' use of toll roads increased by seven per cent between 2014 and 2015, a record-breaking rate of growth that puts tolling usage on pace to double in less than ten years, says IBTTA. The analysis was compiled by collecting data from 31 toll-operated facilities acros