Skip to main content

US DOT awards funding for Maryland Purple Line Project

The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
August 29, 2017 Read time: 2 mins

The 324 US Department of Transportation’s 2023 Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties.

The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College Park, and New Carrollton to three Washington Metropolitan Area Transit Authority rail lines, all three Maryland Area Regional Commuter (MARC) rail lines and 2008 Amtrak’s Northeast Corridor line. Although the project will provide direct connections with Metrorail and MARC, it will remain physically and operationally separate. When completed, the line will make suburb-to-suburb cross-county travel easier and faster.

The project includes the construction of 21 stations, two vehicle and maintenance storage yards with shop facilities, and the procurement of 25 articulated light-rail vehicles.

In addition to the funding from FTA’s Capital Investment Grants Program, in June 2016 US DOT announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$874.6 million to Purple Line Transit Partners for construction of the Maryland Purple Line.

Purple Line Transit Partners to design, build, finance, operate and maintain the 16.2-mile light rail system. MDOT will be the owner of the project and its selected private partner, Purple Line Transit Partners, will implement the project on a design-build-finance-operate-maintain basis.

For more information on companies in this article

Related Content

  • Project to ease traffic on Interstate 80 unveiled
    October 29, 2012
    California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.
  • ITS America’s latest report - vehicle electrification and the smart grid
    November 9, 2012
    The latest report from the Intelligent Transportation Society of America (ITS America), entitled Vehicle Electrification and the Smart Grid - The Supporting Role of Safety and Mobility Services, is to be presented in a webinar hosted by Dr Kenneth Laberteaux, Senior Principal Research Scientist at Toyota Research Institute-North America. The webinar, entitled What’s Driving All This Driving? will be held on 15 November, at 1 p.m. Eastern Time. Click here for more information and to register. The report is
  • Study finds rumble strips save lives on rural highways
    June 2, 2015
    A recently completed study shows that rumble strips are proving to be an effective and low-cost way to reduce crashes on Michigan's state highways. The Michigan Department of Transportation (MDOT) started a major rumble strip program for two-lane high-speed rural highways in 2008. Centre-line and shoulder rumble strips were installed on all MDOT rural, non-freeway highways with posted speed limits of 55 mph and appropriate paved lane and shoulder widths. To date, 5,700 miles of centre-line rumble strips
  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut