Skip to main content

Toll option for new Cape Fear bridge

North Carolina councillors voted to leave option open for proposed structure
By Liam McLoughlin June 6, 2025 Read time: 2 mins
Cape Fear Memorial Bridge in Wilmington, NC (© Rzyotova | Dreamstime.com)

Councillors in North Carolina have left the option open for the proposed replacement Cape Fear Memorial Bridge to be a toll bridge.

Planning and development are underway to replace the Cape Fear Memorial Bridge in Wilmington. The bridge spans the Cape Fear River between Brunswick and New Hanover counties.

Councillors at the Wilmington Urban Area Metropolitan Planning Organization (WMPO) voted to leave the toll option open for the proposed new bridge by eight votes to four, according to local news outlet WECT.

The North Carolina Department of Transportation (NCDoT) says that the bridge replacement would help improve traffic congestion and mobility on a corridor that connects local communities and carries trucks transporting freight to and from the Port of Wilmington.

The proposed new bridge would cost an estimated US$1bn-plus to build. ITS International's sister title Global Highways previously reported that funding worth US$242m was being provided to NCDoT for the Cape Fear bridge replacement project in a funding package being delivered through the Bipartisan Infrastructure Law, but this has come into doubt since the election of the Trump administration. 

The toll option would be one possible way of helping to fill any potential gap in funding.

NCDoT adds that the existing four-lane, steel vertical-lift bridge built in 1969 is becoming functionally obsolete and can no longer effectively service current traffic demands.

"While the existing bridge is safe, it is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis," NCDOT states.

For more information on companies in this article

Related Content

  • Houston hurricane prompts TranStar warning
    April 1, 2019
    Hurricane Harvey led to the creation of the Houston TranStar flood warning app
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • In advance of Congressional debate, IBTTA releases Visioning Summit report
    March 31, 2017
    In the lead-up to a much-anticipated policy debate regarding infrastructure investment, the International Bridge, Tunnel and Turnpike Association (IBTTA) has released The Futures of Transportation, a report of the Transportation Visioning Summit which convened leaders of 18 major US transportation associations to discuss and consider the future of transportation. Topics featured in the report, along with transportation leaders’ thoughts and analysis of each, include: autonomous and connected vehicles, s
  • Parsons Brinckerhoff designing NJ interchange ramps
    January 30, 2014
    Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina