Skip to main content

Parsons Brinckerhoff designing NJ interchange ramps

Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
January 30, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA.

The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the 831 Federal Highway Administration (FHWA) in order to move forward to the preliminary and final design phases.

The project is being undertaken by the Port Authority of New York & New Jersey in cooperation with the 7104 New Jersey Department of Transportation, the FHWA and the cities of Elizabeth and Linden.  

The proposal would add two ramps to the existing interchange of I-278 at US route 1 and 9 and would potentially require a new bridge to be constructed over US route 1 and 9 and, with changes in traffic patterns, it is anticipated that some additional roadway improvements would be required along the US Route 1 and 9 corridor and the improved interchange with I-278.

Related Content

  • January 6, 2016
    WSP/Parsons Brinckerhoff designing segment of I-4 in Florida
    As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
  • October 6, 2014
    Parsons Brinckerhoff to design Cleveland’s pedestrian bridge
    Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland. Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district. The Parsons Brinckerhoff team will develop preliminary plans, includi
  • July 4, 2014
    Parsons Brinckerhoff to modernise Michigan freeway
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
  • November 24, 2014
    Parsons Brinckerhoff to evaluate Babylon transportation
    Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.