Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

For more information on companies in this article

Related Content

  • Award-winning Manchester Metrolink
    October 11, 2013
    Transport for Greater Manchester (TfGM) and Thales recently scooped awards at the recent Light Rail Awards for the Manchester Metrolink extension, where the Metrolink was awarded UK Light Rail Project of the Year, and the Metrolink operator RATP won Operator of the Year. In addition, the M-Pact Thales (MPT) consortium was named European Supplier of the Year.
  • Thales to deploy ETCS Level 2 on Turkey's first high-speed rail line
    March 14, 2012
    Thales has signed a new US$26.3 million signalling contract with Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line.
  • Multimodal link-up in Vancouver
    July 2, 2024
    Metro Vancouver sees the value in seamless travel between modes and is pushing ahead with a new pilot designed to make it a reality. David Arminas reports on the RideLink project
  • New York on target for contactless subway
    June 10, 2020
    OMNY system is expected to supersede MetroCard in 2023