Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

Related Content

  • August 2, 2013
    Half of passengers ‘would pay for better technology’
    David Crawford considers the finding of a passenger attitude survey in nine cities worldwide. Three quarters of regular users of public transport in nine capital and other major cities worldwide believe that electronic ticketing would make travel easier; while an overwhelming 92% would welcome paperless travel in any form, according to a recent consumer survey from global management consultants Accenture. Of the 4,500 urban travellers aged over-18 who were quizzed, some 90% routinely used public transport.
  • October 20, 2017
    Indra to install contactless ticketing Thessaloniki’s Metro, Greece
    Indra has won a contract to install its contactless ticketing systems in 13 stations of subway line 1 in Thessaloniki, Greece. The new solution is designed with the intention of providing easier access, customised rates and efficient data management. The solution aims to provide a more comfortable and fast to access service since users will only need to place their cards close to the reader. In addition, mass data management will offer user rates adapted to their needs with smart cards providing a wider
  • March 14, 2012
    Atkins wins Oslo metro upgrade contract
    Atkins has won design contracts to increase safety, functionality and comfort for travellers on the Oslo Metro, Norway’s rapid transit system.
  • August 14, 2020
    Conduent advances Flanders fare system
    Payment is now contactless on De Lijn network serving 6.5 million Flemish residents