Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

Related Content

  • July 2, 2015
    Bombardier to build new London Overground trains
    Transport for London (TfL) has awarded Bombardier a contract to build a new fleet of trains which will see 45 new trains come into service from 2018. The new trains will operate on the Liverpool Street to Enfield Town, Cheshunt (via Seven Sisters) and Chingford routes and the routes between Barking and Gospel Oak and between Romford and Upminster. It will also enable London Overground to improve service frequencies on other routes. The trains will have similar features to the fleet that serves other
  • January 4, 2016
    London boroughs to get funding to help improve transport, cycling
    Transport services and town centres across London have been given a New Year boost, as the Mayor and Transport for London (TfL) confirm US$218 million in funding for the London boroughs in 2016/17. The annual borough funding is provided by TfL to help the boroughs pay for local transport projects set out in their Local Implementation Plans (LIPs). LIPs are plans that show how the boroughs will support the Mayor’s Transport Strategy in their area. For 2016/17, TfL's financial support for the boroughs’ LI
  • August 25, 2015
    New junction on London’s Cycle Superhighway offers safety measures for cyclists
    Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.