Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

Related Content

  • July 18, 2014
    Contracts awarded for London’s traffic signals upgrade
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • December 9, 2016
    Mayor secures record investment in cycling in London
    London Mayor Sadiq Khan has committed to spending US$194 million (£154 million) per year on cycling over the next five years, representing an average US$21 (£17) per head per annum, a level of spending on a par with Denmark and the Netherlands. The investment, part of the Transport for London (TfL) draft Business Plan, goes beyond his manifesto commitment to increase the proportion of TfL’s budget spent on cycling. It will also include substantial benefits for pedestrians with new pedestrian crossings an
  • October 14, 2014
    New river crossings vital for east London
    With the capital’s population forecast to grow to 10 million people by 2030, and with much of this growth due to take place in east London, demand for crossing the river will increase. Unless new river crossings are provided in east London, the overall growth of this part of London will be affected and its economic potential will not be fully realised. The Silvertown tunnel is a key part of the plans and is now progressing to the next stage with a consultation that starts on 15 October on detailed propos
  • July 25, 2012
    TagMaster wins order from Bombardier for São Paulo Line 5 Project
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.