Skip to main content

Thales to modernise Egyptian railways signalling systems

In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the
May 29, 2013 Read time: 2 mins
In a contract valued at over US$141 million with Egyptian National Railways, 596 Thales is to modernise the signalling systems on the Cairo-Alexandria corridor.

The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year.

The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the telecommunication system and centralised traffic control. The Thales signalling solution will enhance the safety and the capacity of the line, allowing an expected 32 million passengers to use it every year. The new system will allow trains to increase in speed from speeds, and will reduce the headway between trains from ten to five minutes. The construction will take four years.

“We are delighted to have won this important contract. It is the first step of the ambitious renovation programme for the signalling system launched by the Ministry of Transport and the Egyptian National Railways network. The contract fits in with the long term strategy of modernising the railway infrastructure,” said Michelangelo Neri, Thales country director in Egypt.

Related Content

  • November 13, 2012
    Thales awarded Manaus monorail CBTC signalling contract
    The Manaus metro in the city of Amazonas in the heart of the Amazon is to be equipped with Thales’ automated driverless monorail solution, following the award to the company of its second signalling Communications-Based Train Control (CBTC) project in Brazil in less than a year for the The signalling contract was awarded to Thales by the Monotrilho Manaus Consortium, comprising CR Almeida, Mendes Junior, and Serveng-Civilsan e Scomi. The 20 km monorail will be a fully automated driverless system using Thale
  • December 11, 2012
    Thales to supply communications systems for Hyderabad Metro Rail
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w
  • March 23, 2012
    Thales upgrading Kuala Lumpur monorail signalling
    Scomi Engineering, which is upgrading Kuala Lumpur monorail for its operator Prasarana, has selected Thales to supply a turnkey signalling solution costing some US$18.6 million. The monorail, operational since 2003 in Malaysia’s capital, is currently expanding its passenger transportation capacity by the introduction of new rolling stock with four-carriage trains and by the replacement of the existing signalling along the eleven stations of the monorail.
  • March 15, 2012
    EBRD investment to modernise Serbia's railways
    The European Bank for Reconstruction and Development (EBRD) is continuing to support the modernisation of Serbia’s transport infrastructure and promote further reform of the rail sector with a sovereign-guaranteed loan of up to €95 million (US$125 million) to the Serbian Railways company.