Skip to main content

Thales delivers ATO system for the Mecca metro

Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
April 17, 2012 Read time: 2 mins
RSS596 Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.

The ATO (automatic train operation) solution is the last successful stage in this ambitious project, improving metro performance by allowing ‘hands off’ operation by drivers. The solution ensures that trains comply with required track speeds and operating conditions to ensure efficient, safe travel at all times.

Thales has provided a complete solution for the Mecca metro project, including signalling solutions based on its world-leading SelTrac Communications-Based Train Control (CBTC) system, fully integrated communications, an Operation Control Centre (OCC) to supervise the line and an automated passenger information system.

“After managing the security supervision of the holy sites, Thales is very proud to have contributed once again to the improvement of the pilgrimage with this automatic metro,” said Michelangelo Neri, VP for Thales’s civil business in Riyadh, Saudi Arabia.

Related Content

  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • March 16, 2015
    Egis, Systra to carry out design studies for Medina metro
    The Medina Metro Development Authority (MMDA) has awarded Egis, in association with Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead. The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country,
  • November 13, 2012
    Thales awarded Manaus monorail CBTC signalling contract
    The Manaus metro in the city of Amazonas in the heart of the Amazon is to be equipped with Thales’ automated driverless monorail solution, following the award to the company of its second signalling Communications-Based Train Control (CBTC) project in Brazil in less than a year for the The signalling contract was awarded to Thales by the Monotrilho Manaus Consortium, comprising CR Almeida, Mendes Junior, and Serveng-Civilsan e Scomi. The 20 km monorail will be a fully automated driverless system using Thale
  • October 1, 2015
    Thales to upgrade New York’s Queens Boulevard subway line
    In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.