Skip to main content

Thales delivers ATO system for the Mecca metro

Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
April 17, 2012 Read time: 2 mins
RSS596 Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.

The ATO (automatic train operation) solution is the last successful stage in this ambitious project, improving metro performance by allowing ‘hands off’ operation by drivers. The solution ensures that trains comply with required track speeds and operating conditions to ensure efficient, safe travel at all times.

Thales has provided a complete solution for the Mecca metro project, including signalling solutions based on its world-leading SelTrac Communications-Based Train Control (CBTC) system, fully integrated communications, an Operation Control Centre (OCC) to supervise the line and an automated passenger information system.

“After managing the security supervision of the holy sites, Thales is very proud to have contributed once again to the improvement of the pilgrimage with this automatic metro,” said Michelangelo Neri, VP for Thales’s civil business in Riyadh, Saudi Arabia.

Related Content

  • June 26, 2019
    Thales installs signalling technology for Ottawa line extension
    Thales is to provide its SelTrac Communications Based Train Control (CBTC) system for the City of Ottawa’s Stage 2 O-Train Confederation Line Extension project in Canada. Thales says the line will take 780,000 annual rush-hour bus trips off the road and will carry up to 24,000 customers per hour. Once complete, it will run from Trim Road and west to Baseline Road and Moodie Drive across 29 stations spanning a distance of 40km. The CBTC moves block signalling technologies to actively manage the track in r
  • March 25, 2014
    Thales awarded signalling contract for Brazil metro
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães
  • March 25, 2014
    Thales awarded signalling contract for Brazil metro
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães
  • May 29, 2013
    Thales to modernise Egyptian railways signalling systems
    In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the