Skip to main content

Strabag to build Bosnian motorway

A consortium led by Strabag and comprising its partners Euro-Asfalt and ZGB is to build the Svilaj-Odžak section of the international motorway corridor 5c in Bosnia. Work on the 10.4 km long section will begin in October 2013 and includes the construction of the roadway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits. The contract value amounts to around US$112 million.
September 18, 2013 Read time: 1 min
A consortium led by 3861 Strabag and comprising its partners 7502 Euroasfalt and ZGB is to build the Svilaj-Odžak section of the international motorway corridor 5c in Bosnia.

Work on the 10.4 km long section will begin in October 2013 and includes the construction of the roadway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits. The contract value amounts to around US$112 million.

The motorway is to be opened to traffic in December 2014. Work will be carried out by Strabag, Sarajevo.

For more information on companies in this article

Related Content

  • Dynamic charging boosts electric vehicles’ potential
    December 16, 2014
    With an increasing need to use electric vehicles in city centres to reduce pollution, David Crawford looks at various solutions to power delivery. The UN’s September 2014 Climate Summit has added fresh momentum to the drive to increase urban electric vehicle (EV) takeup. It has launched the Urban Electric Mobility Initiative, which wants to see EVs accounting for 30% of all urban travel by 2030, and make cities worldwide more friendly to their use. Encouragingly, the plan is being well supported by commerci
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • Kapsch awarded Toowoomba Second Range Crossing in Queensland
    May 13, 2016
    Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to deliver the roadside tolling system for the Toowoomba Second Range Crossing (TSRC) Project in Queensland, Australia. The contract, awarded by the State of Queensland, comprises supply and operation for 10 years of the roadside system for TSRC and is valued at around US$6.6 million (€6 million). Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow platform and next-generation vision te
  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv