Skip to main content

South Korea company wins contracts in Nepal

The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal.
March 23, 2012 Read time: 1 min
The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal. The government has asked the company to prepare a detailed design, cost-estimate and bidding documents for the construction of the electric railway based on the feasibility studies submitted by the Rites India a year ago. The Indian company has estimated the project will cost about US$11.11 billion.

Chungsuk Engineering will prepare a detailed design that includes all design and drawing of railway track, electrical traction, power system, signalling and telecom, bridge, culverts, and station building and platform.

Ram Krishna Wagle also reports that the Nepalese government has invited Chungsuk for negotiation for a feasibility study concerning a mass rapid transit (MRT) system, both underground and elevated railway or metro railway system, for Kathmandu Valley. The feasibility for the proposed scheme includes detailed analysis of the existing transport facilities, engineering of the existing transport, engineering requirement and demand analysis of the railway lines, economic and financial resettlement and the project viability on economic cost-benefit evaluation.

Related Content

  • March 23, 2012
    EOI for railway project in Nepal
    The government of Nepal has invited an expression of interest (EOI) from interested international companies for consultancy services for the detail survey and design of a 114km electrified railway Line from Simara to Tamsaria (114 km), Ram Krishna Wagel reports. The EOI also covers a 109km section of the proposed Mechi-Mahakali railway link to the border connection with India at Bhairahawa. Closing date of the EOI is 7 January, 2012 and full documents in PDF format, are available from Ram Krishna Wagel at e
  • March 16, 2015
    Egis, Systra to carry out design studies for Medina metro
    The Medina Metro Development Authority (MMDA) has awarded Egis, in association with Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead. The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country,
  • March 22, 2012
    Pöyry wins metro contract in Vietnam
    Pöyry`s Urban Business Group has been awarded a contract to provide services for the design, tender documentation and site supervision phases for Line 2 of the Ho Chi Minh City Metro, Vietnam. The assignment will be carried out with Helsinki-headquartered Pöyry as the technical leader of a consortium that includes ILF Beratende Ingenieure, Germany, Obermeyer Planen + Beraten, Germany and Tedi South, Vietnam. Pöyry's share of the contract is approximately US$16.7 million.
  • April 5, 2021
    LA confirms $133m transit contracts
    Sepulveda Transit Corridor Project includes rail and monorail solutions for busy road routes