Skip to main content

South Korea company wins contracts in Nepal

The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal.
March 23, 2012 Read time: 1 min
The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal. The government has asked the company to prepare a detailed design, cost-estimate and bidding documents for the construction of the electric railway based on the feasibility studies submitted by the Rites India a year ago. The Indian company has estimated the project will cost about US$11.11 billion.

Chungsuk Engineering will prepare a detailed design that includes all design and drawing of railway track, electrical traction, power system, signalling and telecom, bridge, culverts, and station building and platform.

Ram Krishna Wagle also reports that the Nepalese government has invited Chungsuk for negotiation for a feasibility study concerning a mass rapid transit (MRT) system, both underground and elevated railway or metro railway system, for Kathmandu Valley. The feasibility for the proposed scheme includes detailed analysis of the existing transport facilities, engineering of the existing transport, engineering requirement and demand analysis of the railway lines, economic and financial resettlement and the project viability on economic cost-benefit evaluation.

Related Content

  • July 26, 2012
    Personal Rapid Transit, clear benefits for European cities
    David Crawford watches the race to get the world's first PRT system up and running. To paraphrase the old joke about buses bunching, you seem to have to wait several decades for a Personal Rapid Transit (PRT) system, and then half a dozen come along together. Currently, in fact, there are well over that number of schemes for driverless electric passenger-carrying 'pod' networks at various stages of planning, design and implementation around the world. Locations range from a straight-off-the-drawing board ne
  • March 23, 2012
    24-hr metro bus service for Kathmandu metropolitan area
    Kathmandu metropolitan city is planning to operate a 24-hr metro bus system using double-decker buses that will carry more passengers and also provide night services, reports Ram Krishna Wagle from Nepal. An EOI for the operation of the metro bus has appointed a local company which plans to operate 10 buses initially. The company is funding the purchase of the metro bus from its own resources although the government has provided tax breaks for providing the service.
  • March 27, 2012
    24-hr metro bus service for Kathmandu metropolitan area
    Kathmandu metropolitan city is planning to operate a 24-hr metro bus system using double-decker buses that will carry more passengers and also provide night services, reports Ram Krishna Wagle from Nepal. An EOI for the operation of the metro bus has appointed a local company which plans to operate 10 buses initially. The company is funding the purchase of the metro bus from its own resources although the government has provided tax breaks for providing the service.
  • August 25, 2017
    Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia
    The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t