Skip to main content

Siemens wins communications and control systems contract

Siemens is to provide the central section communications and control systems for the high-frequency metro service between Whitechapel and Paddington through new tunnels under central London under a contract announced by Crossrail. The scope of works includes the design, testing, installation and commissioning of key communications and control systems within Crossrail’s central section including CCTV and public address systems at stations, customer information displays, staff and emergency services radio sys
March 18, 2013 Read time: 1 min
189 Siemens is to provide the central section communications and control systems for the high-frequency metro service between Whitechapel and Paddington through new tunnels under central London under a contract announced by Crossrail.

The scope of works includes the design, testing, installation and commissioning of key communications and control systems within Crossrail’s central section including CCTV and public address systems at stations, customer information displays, staff and emergency services radio systems and the data networks that will carry information to and from the route control centre. Installation of the new communications and control systems will get underway in spring 2015.

The contract also includes commitments to provide apprenticeships and job opportunities for Londoners. Siemens will be required to create seven new apprenticeships and five new job start roles for individuals who are long-term unemployed or out of education or training for six months or more during the life of the contract.

Related Content

  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Siemens to provide intelligent technology for Stockholm bypass
    December 3, 2018
    Siemens Mobility is to deliver intelligent tunnel solutions for a section of the European route number four (E4), the Stockholm Bypass, as part of a €75 million contract. The 21km bypass will connect the southern and northern parts of the surrounding Stockholm communities. It includes 18km of tunnelling and is expected to alleviate congestion for residents and visitors. Michael Peter, CEO of Siemens Mobility, says the southern tunnel will minimise environmental impact. Construction is scheduled to be
  • Jeddah juggles transport needs of residents, pilgrims and tourists
    December 22, 2015
    Mass pilgrimages, new tourists and a growing population lead Jeddah to seek some smart transport solutions as David Crawford finds out. Rationalising traffic movement and public transport in a major Middle Eastern business and tourist centre that is also a gateway for millions of religious pilgrims every year is the challenge for the 20-year Jeddah Strategic Plan and the Jeddah Public Transport Programme (JPTP) it spawned. The latter is costed at US$8bn.
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly