Skip to main content

Siemens to electrify metro line in Ecuador

Siemens has been commissioned by the Acciona-Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019. The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,80
October 21, 2016 Read time: 2 mins
189 Siemens has been commissioned by the 4744 Acciona-4740 Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019.

The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,800 metres above sea level. Siemens will be responsible for the complete electrification of the new double-track Metro Line 1 that will connect the northern and southern parts of the city with 15 stations. The scope of the project includes about 46 kilometres of rigid catenary, six kilometres of flexible catenary, eleven traction power supply stations, 29 auxiliary power supply stations, and the SCADA (Supervisory Control and Data Acquisition) system for monitoring and controlling the traction power supply.

The new rail system is an important step in the modernisation of the city and is expected to transport more than 350,000 passengers a day when completed. The city's current heavy volume of traffic regularly leads to traffic jams and smog. By providing a more environmentally friendly mass transit system, the city expects to reduce CO2 emissions by up to 30,000 tons a year.

Related Content

  • November 23, 2016
    Bombardier wins fleet operations and maintenance contract in Montreal
    Rail technology specialist Bombardier Transportation has been awarded an eight-year contract by Montréal's Agence Métropolitaine de Transport (AMT) for the operations and maintenance of the AMT commuter rail fleet on all of its six lines in the greater Montréal area. The contract is valued at approximately US$246 million (CAD$331 million) and includes a two-year option. Bombardier has been providing maintenance services for AMT since 2010. This new contract not only covers the maintenance of AMT's entire
  • December 18, 2015
    Thales to upgrade Greater Cairo Metro
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • April 10, 2014
    Columbia goes intermodal to support sustainability
    David Crawford on the ups and downs of a Latin metropolis. Medellín, Colombia’s second city and a recognised leader in sustainable transport thinking, is rapidly extending its substantial existing investment in modern mobility. It is deploying both an enhanced integrated traffic management array and the country’s first intermodal public transportation management system. The supplier of both, under separate €9 million (US$12.3 million) contracts, is Spanish engineering company Indra, a major exporter
  • March 21, 2016
    Skanska awarded Swedish Malar line project
    Skanska has been awarded a contract worth about US$47.96 million by the Swedish Transport Administration for the expansion of Mälarbanan (Malar Line) between Spånga and Barkarby, north of Stockholm. The turnkey project includes the expansion of Mälarbanan from two to four tracks on a three-kilometre section as well as a new platform. Commuter trains will have two separate tracks, while other trains will pass freely on the two outer tracks. Construction start of preparatory work is planned for the su