Skip to main content

Siemens to build eHighway in Germany

Siemens has been commissioned by the German state of Hesse to build an overhead contact line for electrified freight transport on a ten kilometre stretch of autobahn to supply electricity for the electric drive of a hybrid truck. Siemens will install its eHighway on the A5 federal autobahn between the Zeppelinheim/Cargo City Süd interchange at the Frankfurt Airport and the Darmstadt/Weiterstadt interchange, the first time the eHighway has been tested on a public highway in Germany. Siemens will be responsib
August 11, 2017 Read time: 2 mins
189 Siemens has been commissioned by the German state of Hesse to build an overhead contact line for electrified freight transport on a ten kilometre stretch of autobahn to supply electricity for the electric drive of a hybrid truck.


Siemens will install its eHighway on the A5 federal autobahn between the Zeppelinheim/Cargo City Süd interchange at the Frankfurt Airport and the Darmstadt/Weiterstadt interchange, the first time the eHighway has been tested on a public highway in Germany.

Siemens will be responsible for the planning, construction and, as an option, maintenance of the system, which is being built as part of the joint project “Electrified, innovative heavy freight transport on autobahns” (ELISA) of Germany’s Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB). Hessen Mobil, responsible for road and transport management in Hesse, is managing the project.

The core element of the system is an intelligent pantograph on the trucks combined with a hybrid drive system. Trucks equipped with the system operate locally emission-free with electricity from the overhead line and automatically switch to a hybrid engine on roads without overhead lines.

Siemens claims the eHighway is twice as efficient when compared to internal combustion engines, cutting energy consumption in half and also significantly reducing local air pollution.

For more information on companies in this article

Related Content

  • Strabag awarded rail contract in Hungary
    September 19, 2016
    Strabag is to electrify and upgrade the 51 km railway line between Budapest and Esztergom under a contract awarded by Hungarian investment company, NIF (National Infrastructure Development). The contract, valued at around US$120.5 million (€108 million), will be carried out as a joint venture with TRSZ and MVM OVIT. Construction will begin this summer and is scheduled for completion in 2018. The contract includes new stairs, wide platforms, pedestrian underpass and barrier-free access and noise barriers
  • Progress of ICT transport research projects
    February 3, 2012
    Juhani Jääskeläinen, head of the ICT for Transport Unit, DG Information Society and Media, European Commission, details the results of Call 4 for research projects in ICT for transport. Since the closure of the call and evaluation process during the summer of last year the European Commission (EC) has been negotiating and signing contracts with projects which were selected from proposals submitted to Call 4 of the 7th Framework Programme (FP7) in the area of Information and Communication Technology (ICT) fo
  • Oregon tests new mileage-base charging scheme
    August 5, 2013
    Jack Opiola from D’Artagnan Consulting LLP explains Oregon’s latest moves which mandated a trial of mileage-based road use charging. In 1919, Oregon made the 20th century’s most significant contribution to transportation funding policy, becoming the first state in America to implement a gas tax to pay for roads. This summer Oregon’s Legislature passed, and Governor John Kitzhaber signed into law, Senate Bill 810 which requires a distance-based road usage charge for 5,000 volunteer vehicles by 1 July 2015. T
  • New German cross-industry project to develop 5G vehicle applications
    November 22, 2016
    A new consortium, initiated by Ericsson in Germany, aims to create an infrastructure and real application environment on a motorway test track, to carry out tests in vehicle-to-vehicle, vehicle-to-infrastructure, digitisation of the railway infrastructure and other applications using 5G technology. The 30 kilometre test track consists of several construction sections on the 30 kilometre ‘digital test field motorway’ along the A9 motorway and the high speed rail track between Nuremberg and Greding. The in