Skip to main content

Siemens to build eHighway in Germany

Siemens has been commissioned by the German state of Hesse to build an overhead contact line for electrified freight transport on a ten kilometre stretch of autobahn to supply electricity for the electric drive of a hybrid truck. Siemens will install its eHighway on the A5 federal autobahn between the Zeppelinheim/Cargo City Süd interchange at the Frankfurt Airport and the Darmstadt/Weiterstadt interchange, the first time the eHighway has been tested on a public highway in Germany. Siemens will be responsib
August 11, 2017 Read time: 2 mins
189 Siemens has been commissioned by the German state of Hesse to build an overhead contact line for electrified freight transport on a ten kilometre stretch of autobahn to supply electricity for the electric drive of a hybrid truck.


Siemens will install its eHighway on the A5 federal autobahn between the Zeppelinheim/Cargo City Süd interchange at the Frankfurt Airport and the Darmstadt/Weiterstadt interchange, the first time the eHighway has been tested on a public highway in Germany.

Siemens will be responsible for the planning, construction and, as an option, maintenance of the system, which is being built as part of the joint project “Electrified, innovative heavy freight transport on autobahns” (ELISA) of Germany’s Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB). Hessen Mobil, responsible for road and transport management in Hesse, is managing the project.

The core element of the system is an intelligent pantograph on the trucks combined with a hybrid drive system. Trucks equipped with the system operate locally emission-free with electricity from the overhead line and automatically switch to a hybrid engine on roads without overhead lines.

Siemens claims the eHighway is twice as efficient when compared to internal combustion engines, cutting energy consumption in half and also significantly reducing local air pollution.

For more information on companies in this article

Related Content

  • Prospects for intercity transport technology
    February 1, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • Prospects for intercity transport technology
    February 6, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it
  • Active traffic management increases safety and capacity
    February 2, 2012
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • V2X trials in the US and Europe to finally kick start ITS?
    August 30, 2012
    Large scale, real-life, high profile V2V and V2I trials in both the United States and Germany are are catching the headlines, putting ITS in the limelight after more than a decade of procrastination, according to ABI research. The US DoT Safety Pilot program involves 3,000 vehicles in Ann Arbor, Michigan. In Germany, 120 vehicles in the simTD project (Safe Intelligent Mobility, test- field Germany) will roam the Rhine-Main region until the end of the year and will be focused on traffic, road safety, and ef