Skip to main content

Serco wins Dubai Metro contract extension to 2021

Serco has signed a two-year extension with Dubai’s Roads and Transport Authority (RTA) to continue operating and maintaining Dubai Metro until September 2021. HE Mattar Al Tayer, director general and chairman of the board of executive directors of the RTA, says: “Serco has delivered operational performance levels on the Dubai Metro with a high train service availability of 99.9% and a punctuality of 99.8%, achieving a record of 204 million journeys in 2018.” The £140m contract includes the operation
April 10, 2019 Read time: 1 min

1676 Serco has signed a two-year extension with Dubai’s Roads and Transport Authority (RTA) to continue operating and maintaining Dubai Metro until September 2021.

HE Mattar Al Tayer, director general and chairman of the board of executive directors of the RTA, says: “Serco has delivered operational performance levels on the Dubai Metro with a high train service availability of 99.9% and a punctuality of 99.8%, achieving a record of 204 million journeys in 2018.”

The £140m contract includes the operation and maintenance of the Red Line expansion which is currently under construction. A test run of the expanded service is expected to start in February next year in readiness for full operation ahead of Expo 2020, which begins in October.

Serco says the Red Line expansion adds 15km and provides Dubai Metro with a total length of 90km and over 120 trains running at peak times.

For more information on companies in this article

Related Content

  • Q-Free: contract wins in Thailand and Spain
    June 29, 2017
    Q-Free has recently won two tolling contracts with a combined order value of approximately US$4 million (NOK35 million).
  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    December 5, 2018
    1999’s fatal Mont Blanc fire means safety is a constant concern for tunnel operators. Alternative fuels and automated vehicles were also high on the agenda at PIARC’s first conference on the issue. David Arminas reports from Lyon – and walks the Croix-Rousse tunnel More than ever, tunnel management must be done in a holistic fashion. That was the message from André Broto, president of the World Road Associa-tion (PIARC) as he kicked off PIARC’s first International Conference on Tunnel Operations and Safe
  • Vancouver’s SkyTrain Evergreen extension now in service
    December 9, 2016
    Metro Vancouver's regional transportation authority, TransLink, has inaugurated the SkyTrain Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express. The SkyTrain line was first inaugurated in December 1985, utilising Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain
  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…