Skip to main content

São Paulo re-launches monorail PPP tender

São Paulo state transport department STM has re-launched its US$2.13 billion tender to build, operate, and maintain a monorail for the state capital's metro line 18, also known as the bronze line. The concession involves building and operating the line for 25 years. The line will be a monorail stretching nearly 15 kilometres between São Paulo city and the neighbouring ABC region of Santo André, São Bernardo do Campo and São Caetano do Sul, with 13 stations. The new line will connect the southern neighbou
May 23, 2014 Read time: 2 mins
São Paulo state transport department STM has re-launched its US$2.13 billion tender to build, operate, and maintain a monorail for the state capital's metro line 18, also known as the bronze line.

The concession involves building and operating the line for 25 years. The line will be a monorail stretching nearly 15 kilometres between São Paulo city and the neighbouring ABC region of Santo André, São Bernardo do Campo and São Caetano do Sul, with 13 stations. The new line will connect the southern neighbourhood of Tamanduateí in the state capital to Djalma Dutra in São Bernardo do Campo.

Bidding for the public-private partnership was suspended by state audit court TCE in April following legal action filed local consulting firm PL Consultoria Financeira e RH, which claimed the bidding documents prevented fair competition.  Among the claims is that the documents required that financing be obtained from Brazil's development bank BNDES.

Conditional changes to BNDES's progressive plan have been applied to the new tender documents, according to STM, and interested parties now have until 3 July to submit proposals.

Related Content

  • Monitoring and transparency preserve enforcement's reputation
    July 30, 2012
    What can be done to preserve automated enforcement's reputation in the face of media and public criticism? Here, system manufacturers and suppliers talk about what they think are the most appropriate business models. Recent events in Italy only served to once again to push automated enforcement into the media spotlight. At the heart of the matter were the numerous alleged instances of local authorities and their contract suppliers of enforcement services colluding to illegally shorten amber signal phase tim
  • Slovakia puts out Visnove IT tender
    August 22, 2022
    Tunnel deal expected to be worth €71.5 million and bids can be submitted until 25 October
  • Colombia’s transport infrastructure challenges economic growth
    July 1, 2014
    An inefficient transportation network is one of the key challenges facing further economic growth in Colombia, according to a report from ratings agency Standard and Poor's (S&P). It currently takes ten hours to travel 445 kilometres between Bogotá and Medellín, the country's two largest cities. According to the 2013 World Economic Forum, Colombia's overall infrastructure is better than Argentina's, Paraguay's and Venezuela's in Latin America. "Considering that Colombia's economy has the potential to
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam