Skip to main content

San Diego rail line gets positive train control

Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
July 24, 2013 Read time: 2 mins
Rail Technology supplier 6079 Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million.

Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train, together with back office engineering and systems integration support.

PTC was mandated by the Rail Safety Improvement Act of 2008 and requires fully functional PTC systems to be in place on trains, such as NCTD's Coaster, by 2015. The NCTD system will be fully interoperable with PTC systems being implemented by Class I railroads.

NCTD is a public transportation agency providing 12 million passenger trips annually on around 60 miles of track throughout North San Diego County and into downtown San Diego.  Its system includes Breeze buses, Coaster commuter trains, Sprinter light rail trains, and Lift paratransit service.  

"We're pleased to be working with Herzog, NCTD and other industry suppliers on this important project," said Albert J Neupaver, Wabtec's chairman and chief executive officer.  "This demonstrates the role we can play, as PTC technology continues to be deployed by other transit agencies around the US over the next several years."

Related Content

  • March 6, 2015
    Bill introduced in US Senate to extend positive train control deadline
    Four US senators have introduced the bipartisan Railroad Safety and Positive Train Control Extension Act in an effort to extend the deadline for full implementation of positive train control (PTC) on US railroads to 2020. Missouri has 4,400 miles of main rail track that are operated by 19 different railway companies. PTC is a technology designed to automatically stop or slow a train before certain collisions. The Rail Safety Improvement Act of 2008 mandates that PTC must be installed by31 December 2015. PT
  • March 23, 2012
    Parsons wins major rail contract
    Parsons has been selected by the Peninsula Corridor Joint Powers Board (PCJPB), which owns and operates Caltrain (the commuter rail line between San Francisco and San Mateo and Santa Clara counties), for design and installation of its $138 million interoperable communications-based overlay signal system positive train control (CBOSS PTC).
  • August 16, 2012
    Wabtec to repower Toronto's Metrolinx locomotives
    Wabtec Corporation’s MotivePower subsidiary has signed a $45 million contract with Metrolinx, an agency of the Province of Ontario and the regional transportation authority for the Greater Toronto and Hamilton Area (GTHA), to repower 11 locomotives with new engines and propulsion systems that meet significantly higher environmental standards.
  • August 18, 2016
    FRA awards funding, status report stresses the need for positive train control
    The US Department of Transportation’s (DOT) Federal Railroad Administration (FRA) has awarded US$25 million in grants for 11 projects in six states and the District of Columbia to assist in implementing positive train control (PTC). Many awards will help railroads achieve interoperability among the different PTC systems that railroads are deploying. PTC prevents certain train-to-train collisions, over-speed derailments, incursions into established work zone limits and trains going to the wrong tracks be