Skip to main content

Parsons wins major rail contract

Parsons has been selected by the Peninsula Corridor Joint Powers Board (PCJPB), which owns and operates Caltrain (the commuter rail line between San Francisco and San Mateo and Santa Clara counties), for design and installation of its $138 million interoperable communications-based overlay signal system positive train control (CBOSS PTC).
March 23, 2012 Read time: 2 mins
4089 Parsons has been selected by the Peninsula Corridor Joint Powers Board (PCJPB), which owns and operates Caltrain (the commuter rail line between San Francisco and San Mateo and Santa Clara counties), for design and installation of its $138 million interoperable communications-based overlay signal system positive train control (CBOSS PTC). This contract includes compliance with Federal Railroad Administration (FRA) requirements meeting the mandates of the Railroad Safety Improvement Act of 2008, as well as creating functions that will improve performance of Caltrain passenger operations.

Under the four-year contract, Parsons will design, install, test, integrate, document, commission, and provide warranty services to PCJPB, enabling Caltrain to place CBOSS PTC into revenue service by October 2015.

When completed, Caltrain’s CBOSS PTC will include the capability to prevent train-to-train collisions, excessive speeds, incursions into established work zone limits, and movement through misaligned switches. Parsons will ensure that the CBOSS PTC for Caltrain will be interoperable with the PTC systems implemented by Caltrain tenant railroads:  Union Pacific Railroad (UPRR), Capitol Corridor, Altamont Commuter Express, and 2008 Amtrak, providing seamless operation of trains moving between Caltrain and UPRR-controlled territory.

Related Content

  • February 24, 2014
    Los Angeles Metrolink implements PTC
    Metrolink, southern California’s regional commuter rail service, has launched positive train control (PTC) in revenue service demonstration (RSD) in cooperation with Burlington Northern Santa Fe (BNSF). PTC is one of the National Transportation Safety Board’s (NTSB) top ten most wanted transportation safety improvements. It involves a GPS-based technology capable of preventing train-to-train collisions, over-speed derailments, unauthorised incursion into work zones and train movement through switches le
  • August 18, 2016
    FRA awards funding, status report stresses the need for positive train control
    The US Department of Transportation’s (DOT) Federal Railroad Administration (FRA) has awarded US$25 million in grants for 11 projects in six states and the District of Columbia to assist in implementing positive train control (PTC). Many awards will help railroads achieve interoperability among the different PTC systems that railroads are deploying. PTC prevents certain train-to-train collisions, over-speed derailments, incursions into established work zone limits and trains going to the wrong tracks be
  • September 7, 2015
    Chicago’s Metra rail system implements PTC
    US systems integrator Parsons has been selected by Metra, Chicago’s commuter rail operator, to install positive train control (PTC) technology on its commuter rail trains. PTC, which is federally mandated, is high tech collision avoidance technology that monitors and controls train movements. It is intended to prevent train to train collisions, over-speed derailments, incursions into established work zones, and movement of trains through a main line switch left in an improper position. As prime contra
  • July 29, 2016
    US DOT makes funding available for positive train control implementation
    The US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation. The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives. FRA will accept applications until 5 pm EDT on 28 Sept. 28ember. Projects eligible for grants must develop information that ass