Skip to main content

Sacramento to trial EV charging

The city of Sacramento in California is to trial electric vehicle (EV) charging on its own EVs. Evatran, developer of Plugless Power wireless electric vehicle charging technology, has announced that the city is to take part in its Apollo Trial Program, joining industry participant such as Bosch Automotive Service Solutions, Duke Energy, Google, DTE Energy, and the Hertz Corporation. Plugless Power technology, based on the 100 year old principle of magnetic induction, was developed to allow electric vehicle
December 18, 2012 Read time: 2 mins

The city of Sacramento in California is to trial electric vehicle (EV) charging on its own EVs.  6265 Evatran, developer of Plugless Power wireless electric vehicle charging technology, has announced that the city is to take part in its Apollo Trial Program, joining industry participant such as 311 Bosch Automotive Service Solutions, 1755 Duke Energy, 1691 Google, DTE Energy, and the 6266 Hertz Corporation. 

Plugless Power technology, based on the 100 year old principle of magnetic induction, was developed to allow electric vehicle drivers to avoid the repetitive process of physically plugging-in and unplugging their EVs on a daily basis. Previous trial participants have commented on the convenience of the wireless charging system and the effortless lifestyle it affords an EV driver. 

The Apollo participants will be trialing the second generation of Evatran's technology, improved through the first phase of the program, launched in March 2012 with Google, Hertz, Duke Energy, Clemson University, and the Los Angeles Department of Water and Power (LADWP).    

"We are deeply committed to creating a sustainable city," said John Shirey, Sacramento city manager. "We made considerable strides over the years making aspects of our vehicle fleet, our city-owned buildings, parking garages, and street lights eco-friendly.  With this partnership and pilot program, we have the ability to go even further with incorporating green practices that make good sense.  In the end, we as a City are setting the example of reducing our carbon footprint." 

"This second phase of the program," commented Rebecca Hough, Evatran's chief executive officer and co-founder, "is aimed at confirming our production design is ready for release to individual electric vehicle owners. The first phase of the Program guided us towards the optimal design for user interface, communication speed, industrial design, and parking guidance. For the second phase, we've focused on getting a diverse collection of installation locations – from Detroit to southern California to the south east – to insure we're ready to launch the product on a nationwide scale." 

Evatran plans to have over twenty installations as part of the Apollo trial program. The partners will trial the second generation systems for three months and then Evatran will release the product to individual EV owners across the country.

For more information on companies in this article

Related Content

  • Driverless vehicles just around the corner?
    February 28, 2013
    umors that self-driving taxis are about to hit the streets of Las Vegas have turned out to be untrue… but the age of the driverless vehicle is only just around the corner, as Pete Goldin finds out. From Herbie the Love Bug to Knight Rider to the cast of the Pixar film Cars, the autono­mous auto has long been a beloved icon in the entertainment industry. But how close is the fiction to fact? The general public might be surprised to find out just how soon autonomous vehicles could be driving on our roadways.
  • North America's first public-use quick-charge station for EVs opens
    January 31, 2012
    Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.
  • North America's first public-use quick-charge station for EVs opens
    January 31, 2012
    Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.
  • Uber clean-up - those all-important facts and figures
    September 11, 2020
    Ride-hailing giant says it can switch to all-electric vehicles 'in any major city' by 2030