Skip to main content

North America's first public-use quick-charge station for EVs opens

Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.
January 31, 2012 Read time: 2 mins

1067 Portland General Electric, Oregon’s largest utility, and 1068 NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.

“By making charging convenient and available for public use, we are telling car manufacturers that Oregon is ready for the next generation of electric vehicles — and we want our state to be a leader in introducing these cars to the rest of the country.”

The station was awarded public-use certification by the City of Portland following the successful installation and testing of the station manufactured by Takasago, a subsidiary of NEC, at the PGE headquarters in the Two World Trade Center parking garage on Salmon Street, Portland. The Takasago Rapid Charging Station is specialised for recharging electric vehicles with lithium-ion batteries and requires only 20 to 30 minutes to recharge a battery to 80 percent of full strength.

PGE and NEC officially opened the quick-charge station with Governor Ted Kulongoski, who charged up an all-electric Nissan Leaf , during a two-day Leaf test drive event at PGE. Portland and the state of Oregon have been designated as top-tier launch markets for the Nissan Leaf when it goes on sale in the United States in December.

“Quick-charging stations are an exciting advancement in our effort to bring electric vehicles to Oregon,” said Gov. Kulongoski. “By making charging convenient and available for public use, we are telling car manufacturers that Oregon is ready for the next generation of electric vehicles, and we want our state to be a leader in introducing these cars to the rest of the country.”

Related Content

  • January 31, 2012
    North America's first public-use quick-charge station for EVs opens
    Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.
  • July 17, 2012
    Charging station infrastructure boost to electric vehicle use
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • April 16, 2012
    Nissan Leaf will power homes
    Nissan Motor Company has unveiled a system which enables electricity to be supplied from the lithium-ion batteries installed in Nissan Leaf to ordinary households, as part of its comprehensive efforts toward the realisation of a zero-emission society. The new system was unveiled at a house built in front of the Nissan global headquarters by Sekisui House Ltd.
  • September 21, 2012
    Mass production zero emission vehicle to be released
    Following the success of its Nissan LEAF electric car, Nissan is now in the final development phase of its second mass produced zero emission vehicle: the Nissan e-NV200 compact van. Nissan has been working with FedEx Express since late last year to develop the vehicle with the delivery company seen as an ideal partner because of its fleet of 130 all-electric vehicles globally. The company says the electric van will boast an all-electric drivetrain based on the Nissan LEAF. Its power comes from a lithium-io