Skip to main content

Plans submitted for UK’s Luton Airport Gateway

Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f
March 7, 2017 Read time: 2 mins
Knight Architects and 7942 Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station.

The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a fully-automated, two-way, 24-hour capable people-mover based on latest system technology and design innovation running alongside the mainline railway before crossing over Airport Way via the new landmark bridge.

The London Luton Gateway Bridge has been designed as an asymmetric truss structure, spanning 72m across the busy Airport Way. Its top chord traces a parabola which springs tangentially from the deck, before tapering to a slender profile which appears to fade into the distance.

At night the top chord is illuminated with an active-led system. attached directly to the structure and aimed downwards. This allows the lighting system safely operate in its airport environment, without interfering with the functional lighting behind.

Subject to planning permission, work could begin in late 2017, with the system ready for operation by spring 2021.

Related Content

  • March 28, 2023
    £2 bus scheme sees Go-Ahead carrying 10 million passengers
    One route has seen a jump of 130% in ridership since the start of discounted fares
  • May 21, 2012
    Fast and efficient barrier-free electronic toll collection
    Canada’s 407 tolled highway allows non-stop travel and a fast and efficient way of paying for it. Ontario’s 407 ETR highway features one of the most advanced barrier-free and all- electronic toll collection systems in the world. The company that operates the road launched the latest phase of its strategy to provide end-to-end automation in summer 2011. A self-service website is now available, allowing users to view and pay charges online using technology supplied by the international market leaders in e-bil
  • September 24, 2013
    ICE pledges support for Mersey Gateway Project
    The Mersey Gateway Project in Liverpool, UK, has been endorsed by the UK’s most senior civil engineer, Nick Baveystock, director general of the Institution of Civil Engineers, on a trip to the area see the location of the new bridge and learn more about plans for the project. The centrepiece of the Mersey Gateway Project is a new six-lane toll bridge over the River Mersey. The existing Silver Jubilee Bridge will also be tolled as part of the project, which is expected to help create thousands of new jobs
  • September 7, 2020
    Tattile part of Genoa bridge warning system 
    WiM sensor and camera combination designed to prevent repeat of 2018's fatal collapse