Skip to main content

Plans submitted for UK’s Luton Airport Gateway

Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f
March 7, 2017 Read time: 2 mins
Knight Architects and 7942 Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station.

The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a fully-automated, two-way, 24-hour capable people-mover based on latest system technology and design innovation running alongside the mainline railway before crossing over Airport Way via the new landmark bridge.

The London Luton Gateway Bridge has been designed as an asymmetric truss structure, spanning 72m across the busy Airport Way. Its top chord traces a parabola which springs tangentially from the deck, before tapering to a slender profile which appears to fade into the distance.

At night the top chord is illuminated with an active-led system. attached directly to the structure and aimed downwards. This allows the lighting system safely operate in its airport environment, without interfering with the functional lighting behind.

Subject to planning permission, work could begin in late 2017, with the system ready for operation by spring 2021.

Related Content

  • August 19, 2015
    First VMS installed on Gateway WA project
    Australian signs manufacturer, A.D. Engineering International was selected by DownerMouchel to provide overhead variable message signs for the Gateway WA project, which aims to improve the safety and efficiency of one of Western Australia’s most important transport hubs around Perth airport. Gateway WA was selected as the alliance partner by Main Roads Western Australia to deliver the $1 billion Gateway WA Perth Airport and Freight Access Project on behalf of the Australian and Western Australian Governm
  • January 19, 2016
    Major funding for UK’s low carbon automotive technology
    Five new innovative projects to develop new low carbon and energy efficient technology in the automotive sector have been awarded US$107 million of joint UK government and industry funding. The measure, which is set to boost jobs and growth in the sector, was announced today by Business Secretary, Sajid Javid, on a visit to the Morgan Motor Company. The funding has been awarded by the Advanced Propulsion Centre, a 10-year, US$1.4 billion joint partnership between Government and the automotive industry. T
  • March 20, 2020
    Coronavirus: World’s transit system moves into lockdown
    The threat of coronavirus is plunging the world’s transit systems into lockdown as ridership numbers dwindle and limited services become the norm.
  • July 20, 2021
    Future-proofing transportation with a one-stop optical network solution
    Huawei is helping transportation customers leverage optical transmission networks to optimise their communications and ensure business survival in the fast-changing worlds of road, rail, aviation, maritime and logistics