Skip to main content

Plans submitted for UK’s Luton Airport Gateway

Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f
March 7, 2017 Read time: 2 mins
Knight Architects and 7942 Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station.

The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a fully-automated, two-way, 24-hour capable people-mover based on latest system technology and design innovation running alongside the mainline railway before crossing over Airport Way via the new landmark bridge.

The London Luton Gateway Bridge has been designed as an asymmetric truss structure, spanning 72m across the busy Airport Way. Its top chord traces a parabola which springs tangentially from the deck, before tapering to a slender profile which appears to fade into the distance.

At night the top chord is illuminated with an active-led system. attached directly to the structure and aimed downwards. This allows the lighting system safely operate in its airport environment, without interfering with the functional lighting behind.

Subject to planning permission, work could begin in late 2017, with the system ready for operation by spring 2021.

Related Content

  • June 21, 2018
    Bombardier's Innovia ATM to meet passenger demand at Shenzen Airport
    Bombardier Transportation says its automated people mover (APM) 300 system will help manage increasing passenger numbers at China's Shenzhen Airport, terminal 3. The contract, valued ¥453m (£53m), will be carried out by CRRC Puzhen Bombardier Transportation Systems (PBTS) and is expected to be operational in 2020. PBTS is a joint venture between Bombardier Transportation and Chinese railway rolling stock manufacturer CRRC Nanjing Puzhen. Through the agreement, PBTS will deliver an integrated system
  • April 25, 2013
    Widest bridge in the world Port Mann open in Vancouver
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.
  • April 9, 2014
    Buses services benefit from seamless Wi-Fi data transfer
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.
  • October 21, 2014
    London’s strategy to tackle air quality problems
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.