Skip to main content

Peru prequalifies three consortiums for Lima metro line 2

Peru's private investment promotion agency ProInversión has prequalified three consortiums for the US$5.70 billion construction, operation and maintenance of line 2 of Lima's metro. Technical and economic offers are still due by 21 February, with ProInversión aiming to award the tender for the 35-year concession on 28 February. The consortiums are: Consorcio Nuevo Metro de Lima, comprised of Spain's ACS and FCC, Italian companies Impregilo and AnsaldoBreda and Peru's Cosapi; Consorcio Metro Subterráneo
February 7, 2014 Read time: 2 mins
Peru's private investment promotion agency ProInversión has prequalified three consortiums for the US$5.70 billion construction, operation and maintenance of line 2 of Lima's metro.

Technical and economic offers are still due by 21 February, with ProInversión aiming to award the tender for the 35-year concession on 28 February.

The consortiums are: Consorcio Nuevo Metro de Lima, comprised of Spain's 13 ACS and 5656 FCC, Italian companies Impregilo and AnsaldoBreda and Peru's Cosapi; Consorcio Metro Subterráneo de Lima, which joins Italian concessionaire Astaldi and Controladora de Operaciones de Infraestructura - a subsidiary of Mexico's 4285 ICA; and Consorcio Metro de Lima Linea 2,made up of Brazil's 4740 Odebrecht, Construtora 4429 Andrade Gutierrez, Queiroz Galvão Construtora and Peruvian engineering and construction company Graña y Montero.

The work will entail building 35 kilometres of underground railway line, including an 8 kilometre stretch branching off line 2, together with the stations and a metro repair area, installing various technical and electrical systems, and supply of the rolling stock.

The new line will connect line 1 and the future line 3 and transport about 600,000 passengers a day, benefiting about 2.4 million people overall.

For more information on companies in this article

Related Content

  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Siemens to modernise metro line in Peru
    January 4, 2017
    Siemens is to provide the complete traction power supply for the first section of metro line 1 in Lima, which covers around nine kilometres. The modern power supply, upgrading of existing overhead contact line system and modifications to electrification in the depots will increase both the availability and the cost-effectiveness of the rail route. The upgrade will be carried out during ongoing operation. Lima's first metro line was completed in 2011, covering around 21 kilometres. The line connects the s
  • Lima tenders 47 bus routes
    April 25, 2014
    Peruvian capital Lima's urban transport authority GTU has launched the tender for group one of its bus corridor project. Group one is split into 26 different packets and includes 47 routes and 2,664 buses in the southern and centre-south zones of Lima, according to tender documents. Each concession is for the operation and maintenance of the route for a period of ten years.
  • Italian consortium to build Naples-Bari high-speed railway
    March 2, 2017
    A consortium of Salini Impregilo and Astaldi has won a contract valued at US$418 million (€397 million) for the design and construction of the Naples to Cancello section of the Naples to Bari high-speed railway line in Italy, part of the Scandinavia to Mediterranean Corridor of the Trans-European Network (TEN).