Skip to main content

PB to undertake Vancouver transit improvement project

C-Tran, the Vancouver, Washington public transit agency, has awarded a contract to Parsons Brinckerhoff for a transit improvement project that will consider bus rapid transit (BRT) options.
March 26, 2012 Read time: 1 min
4281 C-Tran, the Vancouver, Washington public transit agency, has awarded a contract to 4089 Parsons Brinckerhoff for a transit improvement project that will consider bus rapid transit (BRT) options.

The project involves performing an alternatives analysis (AA) using the Federal Transportation Administration’s Small Starts process to develop and evaluate a range of  BRT build alternatives, including guideway treatments, station locations and concepts, potential new park-and-ride facilities, sizing and locations. In addition, the PB team is responsible for community outreach, conceptual engineering of the alternatives and station areas, and environmental analysis.

Bus service along the route being evaluated, the Fourth Plain Corridor, carries 27 per cent of C-Tran’s total ridership.  However, schedule reliability is consistently compromised due to localised traffic congestion, closely spaced stops and increasing numbers of people using mobility devices. It is not uncommon to see riders standing on the bus, and even “bus bunching” due to the challenge of maintaining schedule reliability. With BRT operating with priority treatment and, possibly, in some form of a fixed guideway along the corridor, C-Tran believes that most, if not all, of these challenges could be successfully addressed, and attract new riders to the system.

Related Content

  • April 17, 2012
    Green light for Houston light rail project
    Granite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.
  • April 9, 2014
    Buses services benefit from seamless Wi-Fi data transfer
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.
  • January 30, 2014
    Parsons Brinckerhoff designing NJ interchange ramps
    Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
  • March 10, 2015
    US public transportation records passenger numbers highest for 58 years
    Americans took 10.8 billion trips on public transportation in 2014, which is the highest annual public transit ridership number in 58 years, according to a report by the American Public Transportation Association (APTA). “In 2014, people took a record 10.8 billion trips on public transportation -- the highest annual ridership number in 58 years,” said Phillip Washington, APTA chair and CEO and general manager of the Regional Transportation District in Denver. “Some public transit systems experienced all-ti