Skip to main content

Los Angeles Metrolink implements PTC

Metrolink, southern California’s regional commuter rail service, has launched positive train control (PTC) in revenue service demonstration (RSD) in cooperation with Burlington Northern Santa Fe (BNSF). PTC is one of the National Transportation Safety Board’s (NTSB) top ten most wanted transportation safety improvements. It involves a GPS-based technology capable of preventing train-to-train collisions, over-speed derailments, unauthorised incursion into work zones and train movement through switches le
February 24, 2014 Read time: 3 mins
Metrolink, southern California’s regional commuter rail service, has launched positive train control (PTC) in revenue service demonstration (RSD) in cooperation with Burlington Northern Santa Fe (BNSF).

PTC is one of the 5628 National Transportation Safety Board’s (NTSB) top ten most wanted transportation safety improvements.  It involves a GPS-based technology capable of preventing train-to-train collisions, over-speed derailments, unauthorised incursion into work zones and train movement through switches left in the wrong position. PTC monitors and, if necessary, controls train movement in the event of human error. PTC may also bring trains to a safe stop in the event of a natural disaster.

Metrolink now has the ability to implement PTC on specific trains and the Federal Rail Administration (FRA) has authorised its use on BNSF territory using 6079 Wabtec’s  interoperable electronic train management system (I-ETMS). Metrolink’s PTC service on BNSF track will be implemented on select trains on the Metrolink 91 Line. The technology is expected to be available on Metrolink later this year, while the entire service area is anticipated to be complete well before the Rail Safety Improvement Act (RSIA) mandate of December 2015.

The RSIA became law in 2008 after a contractor engineer operating a Metrolink train failed to stop at a red signal just north of the Metrolink Chatsworth Station. This action led to a head-on collision with a freight train resulting in 25 passenger deaths and more than 130 injuries.

The estimated cost for developing, installing and deploying PTC on the Metrolink system including the expansion of the communication network to support the PTC system is US$216.3 million, funded by local, state and federal sources.

Speaking at the launch, Metrolink Board Chair Pat Morris, said: “I have spent my entire life around the rail, but this is unequivocally the most instrumental piece of technology ever implemented for train safety,” said Morris, who worked his way through Stanford Law School at the ATSF Railway. “PTC will undoubtedly make Metrolink the safest commuter rail system in the country; the invaluable partnership between Metrolink and the BNSF has made today a reality.”

“Commuters across the country deserve the safest trains and routes possible, and the adoption of Positive Train Control (PTC) by Metrolink will make Los Angeles one of the first in the nation to adopt this life-saving technology,” said Rep. Adam Schiff (D-Burbank), sponsor of the Rail Collision Prevention Act, which required implementation of Positive Train Control on passenger trains. “With human errors accounting for forty percent of all rail accidents, PTC will save lives and the rest of the country needs to adopt these systems as soon as possible.”

Related Content

  • April 22, 2015
    US senators announce positive train control legislation
    Following unacceptable delays in adoption of life-saving technology, US Senators Charles Schumer and Richard Blumenthal have announced the Positive Train Control Safety Act. This major rail safety bill ensures railroads are moving forward swiftly to install positive train control technology (PTC), following repeated delays in implementation of this critical technology. The bill also takes important steps to improve rail inspection practices, and enhance safety at grade crossings and work zones following rep
  • January 7, 2013
    Rail safety technology launched in Central Minnesota
    New safety technology being installed along some rail lines across the US, including Central Minnesota, aims to prevent deadly train crashes caused by human error. The technology is designed to automatically stop or slow a train to prevent accidents such as a collision with another train or a derailment caused by excessive speed. The changes stem from federal legislation passed in 2008 after a commuter train collided head-on with a freight train in California, killing twenty-five people and injuring 135. An
  • August 18, 2016
    FRA awards funding, status report stresses the need for positive train control
    The US Department of Transportation’s (DOT) Federal Railroad Administration (FRA) has awarded US$25 million in grants for 11 projects in six states and the District of Columbia to assist in implementing positive train control (PTC). Many awards will help railroads achieve interoperability among the different PTC systems that railroads are deploying. PTC prevents certain train-to-train collisions, over-speed derailments, incursions into established work zone limits and trains going to the wrong tracks be
  • March 23, 2012
    Parsons wins major rail contract
    Parsons has been selected by the Peninsula Corridor Joint Powers Board (PCJPB), which owns and operates Caltrain (the commuter rail line between San Francisco and San Mateo and Santa Clara counties), for design and installation of its $138 million interoperable communications-based overlay signal system positive train control (CBOSS PTC).