Skip to main content

Parsons wins Engineering Excellence Grand Award

US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
February 14, 2017 Read time: 2 mins
US engineering services firm 4089 Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the 1773 Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road.

Built in 1957, the existing three sets of concrete slab bridges were located within a two mile stretch of I-70. To maintain traffic during construction, the westbound single-span bridges were designed and built using slide-in bridge construction (SIBC) in which the new bridges were built adjacent to the old bridges and then slid into their permanent location after the old bridges were demolished. The eastbound spans of these two bridges were constructed using the traditional bridge-building method, where the old bridge is demolished and a new bridge is built in its place. The twin spans of the Business Loop Bridge were replaced with one single-span bridge which also used the SIBC technique. It was positioned in a slightly different location than the old bridge to better accommodate intersecting traffic.

In addition to the designs for accelerated bridge construction, Parsons also provided new interchange designs at Business Loop and Range Line to increase corridor mobility, enhance pedestrian connectivity and improve motorist safety. The Range Line/I 70 interchange was converted from a signalised diamond interchange to two tear shaped roundabouts that join together to form a single roundabout. The Business Loop/I 70 interchange was improved with dual-lane roundabouts on the north and south sides of I 70.

Related Content

  • December 26, 2023
    Atlantic City refuses to gamble on road safety
    US city makes traffic management improvements to reduce fatalities on Atlantic Avenue
  • December 15, 2015
    Mobility as a Service gaining traction in US and Europe
    As Mobility as a Service starts to move into the mainstream of transport planning, David Crawford compares European and North American initiatives. Mobility as a Service (MaaS) is a concept fast gaining traction on both sides of the Atlantic as a way of giving travellers digital multimodal one-stop shops and journey planning tools as an alternative to private car use. Planned delivery methods include subscription-based travel packages in Europe, and 'mobility aggregator' apps, including employee commute ben
  • January 20, 2012
    Adaptive control reduces travel time, cuts congestion
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.
  • September 29, 2020
    SkyTrain signals more work for Thales
    Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system