Skip to main content

Parsons wins Engineering Excellence Grand Award

US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
February 14, 2017 Read time: 2 mins
US engineering services firm 4089 Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the 1773 Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road.

Built in 1957, the existing three sets of concrete slab bridges were located within a two mile stretch of I-70. To maintain traffic during construction, the westbound single-span bridges were designed and built using slide-in bridge construction (SIBC) in which the new bridges were built adjacent to the old bridges and then slid into their permanent location after the old bridges were demolished. The eastbound spans of these two bridges were constructed using the traditional bridge-building method, where the old bridge is demolished and a new bridge is built in its place. The twin spans of the Business Loop Bridge were replaced with one single-span bridge which also used the SIBC technique. It was positioned in a slightly different location than the old bridge to better accommodate intersecting traffic.

In addition to the designs for accelerated bridge construction, Parsons also provided new interchange designs at Business Loop and Range Line to increase corridor mobility, enhance pedestrian connectivity and improve motorist safety. The Range Line/I 70 interchange was converted from a signalised diamond interchange to two tear shaped roundabouts that join together to form a single roundabout. The Business Loop/I 70 interchange was improved with dual-lane roundabouts on the north and south sides of I 70.

Related Content

  • December 6, 2012
    New Port Mann Bridge opens to eight lanes of traffic
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
  • January 30, 2012
    WIM system award
    International Road Dynamics (IRD) has been awarded a contract, valued at over US$1 million, for a high-speed Weigh-In-Motion (WIM) system by New Brunswick Department of Transportation in Canada.
  • March 26, 2012
    PB to undertake Vancouver transit improvement project
    C-Tran, the Vancouver, Washington public transit agency, has awarded a contract to Parsons Brinckerhoff for a transit improvement project that will consider bus rapid transit (BRT) options.
  • June 17, 2016
    Joining old and new in Canada’s Highway 407
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth