Skip to main content

Parsons Brinckerhoff to provide quality control for Cleveland bridge

Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
February 14, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is part of the winning design-build team selected by the 7609 Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF).  

The eastbound bridge is part of a phased project that will ultimately demolish the old I-90 viaduct bridge and replace it with eastbound and westbound twin bridges, each carrying five lanes of one-way traffic over the Cuyahoga River Valley. With the westbound bridge now complete and carrying bi-directional traffic, demolition of the old I-90 viaduct bridge has begun and the new eastbound bridge is being designed and built.  As the IQF, Parsons Brinckerhoff is responsible for verifying that all work meets the requirements of the contract documents and the quality program. The firm will also facilitate continuous quality improvements.

Related Content

  • August 19, 2013
    New era of MAX transport for Perth
    A joint venture of Parsons Brinckerhoff and Aecom has been selected by Western Australia’s Department of Transport (DoT) to form an integrated services team for the next phase of the 22 km Metro Area Express (MAX) light rail network. The JV is working with the DoT to develop a robust business case for the US$1.8 billion project that will change the face of Perth’s transport network. MAX project director for the DoT, David Thomas, said the project will introduce a new era of public transport to Perth. “MAX w
  • January 27, 2015
    Consortium named for Pennsylvania PPP bridge project
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme
  • January 30, 2014
    Parsons Brinckerhoff designing NJ interchange ramps
    Parsons Brinckerhoff is to carry out conceptual design and related environmental services for the I-278/route 1 and 9 interchange ramps in Union County, New Jersey, USA. The project involves traffic studies, travel forecasting and modelling, concept development, environmental investigations and extensive stakeholder and public coordination, with the aim of preparing an environmental assessment to be approved by the Federal Highway Administration (FHWA) in order to move forward to the preliminary and fina
  • April 19, 2012
    Improving safety at Mersey Tunnel
    Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The