Skip to main content

New London development installs EV chargers

Exemplar, the developer of Fitzroy Place, one of London’s most high-profile and successful new mixed-use developments, has appointed Swarco company Evolt to supply and install 38 single outlet AC wall mount electric vehicle (EV) charge points.
September 9, 2016 Read time: 1 min

Exemplar, the developer of Fitzroy Place, one of London’s most high-profile and successful new mixed-use developments, has appointed 129 Swarco company Evolt to supply and install 38 single outlet AC wall mount electric vehicle (EV) charge points.

Evolt will also install the latest load distribution technology, which ensures the total power to all charge points is consistently available, evenly distributed and prevents overloading. When an EV is fully charged, its power usage is re-distributed to the other EVs so that they can achieve a full charge in the fastest possible time.

The charge points are split into four groups, with each group being controlled by a distribution board. They are also connected to a centralised server, which manages the entire system and provides a real-time reporting function for operators. The server also has a failsafe mechanism in case of a local power outage, where it ‘instructs’ the distribution boards to continue charging vehicles at a default setting.

For more information on companies in this article

Related Content

  • Lidar: recipes for success
    March 28, 2022
    Lidar is being deployed all over the world - and you can even read a cookbook on the subject...
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • 38,000 EV chargers coming to California 
    August 4, 2021
    200 EV ports are available at the Los Angeles County Fair